DOB filing B00390341-I1
Alteration filing at 1279 Delmar Loop
Building record · BIN 3098299
1279 Delmar Loop, Brooklyn, NY 11239
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3098299
1279 Delmar Loop
Spring Creek-Starrett City, Brooklyn
A consolidated public-record view · updated May 29, 2024
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3098299. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 5 recorded as completed, 5 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1279 Delmar Loop.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Structural repairs to the existing garage concrete roof slab with related shoring as shown on plans filed herewith. repair topside and underside of parking decks and stairs. remove and replace non-structural concrete masonry units. Filing B00216095-I1.
Filing B00216095-I1 reached an approved status.
DOB lists a first permit date for B00216095-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00216095-I1.
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions. Filing B00343131-I1.
Filing B00343131-I1 reached an approved status.
DOB lists a first permit date for B00343131-I1. That is not by itself confirmation of activity on site.
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions. Filing B00343131-P1.
Filing B00343131-P1 reached an approved status.
DOB recorded a sign-off for B00343131-I1.
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390340-I1.
Install new exhaust fan and associated ductwork. Filing B00401918-I1.
Filing B00401918-I1 reached an approved status.
Filing B00390340-I1 reached an approved status.
DOB lists a first permit date for B00390340-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00401918-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00401918-I1.
Installation of (4) new gas boilers and their prefabricated enclosure. Filing B00390341-I1.
Filing B00390341-I1 reached an approved status.
The latest status recorded for B00216095-I1 is “LOC Issued.”
The latest status recorded for B00343131-I1 is “LOC Issued.”
The latest status recorded for B00343131-P1 is “Approved.”
The latest status recorded for B00401918-I1 is “LOC Issued.”
DOB lists a first permit date for B00390341-I1. That is not by itself confirmation of activity on site.
Installation of (4) new gas boilers and their prefabricated enclosure. Filing B00390341-P1.
Filing B00390341-P1 reached an approved status.
The latest status recorded for B00390341-P1 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390340-P1.
Filing B00390340-P1 reached an approved status.
The latest status recorded for B00390340-P1 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390340-P2.
Filing B00390340-P2 reached an approved status.
The latest status recorded for B00390340-P2 is “Approved.”
Installation of new gas plumbing piping for related new boilers to be installed. Filing B00390340-P3.
Filing B00390340-P3 reached an approved status.
The latest status recorded for B00390340-P3 is “Approved.”
DOB recorded a sign-off for B00390340-I1.
The latest status recorded for B00390340-I1 is “LOC Issued.”
DOB recorded a sign-off for B00390341-I1.
The latest status recorded for B00390341-I1 is “LOC Issued.”