Building record · BIN 3102574

506 East 94 Street

506 East 94 Street, Brooklyn, NY 11212

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3102574

506 East 94 Street

East Flatbush-Remsen Village, Brooklyn

A consolidated public-record view · updated Oct 8, 2026

DOB filings
11
Active-status
11
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records11
First included filingMar 12, 2026
Latest recorded changeOct 8, 2026

The lot

What is already here?

The lot holds a 2-story walk-up apartment building built in 1920, with 3 homes, on a 2,900 sq ft lot.

Built
1920
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,900 sq ft
Building area
2,400 sq ft

Housing violations

12 violations are open against this address under the Housing Maintenance Code. 2 of them are the class the city calls immediately hazardous.

  • 2Immediately hazardous
  • 2Hazardous
  • 6Non-hazardous
  • 2Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

CHURCH PROPERTY REALTY CORP.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3102574. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 new building, 7 alteration filing. Its latest status categories are 11 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 12, 2026
Latest recorded change
Oct 8, 2026
Highest proposed story count
9 stories
Highest proposed unit count
39 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 506 East 94 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Plumbing specifications filed in conjunction with gc application b01295753-i1. Filing B01295753-S3.

    01
  2. New building filed

    Sprinkler & standpipe specifications filed in conjunction with gc application b01295753-i1. Filing B01295753-S4.

    02
  3. New building filed

    Mechanical specifications filed in conjunction with gc application b01295753-i1. Filing B01295753-S6.

    03
  4. New building approved

    Filing B01295753-S4 reached an approved status.

    04
  5. New building filed

    Temporary standpipe specifications filed in conjunction with gc application b01295753-i1. Filing B01295753-S9.

    05
  6. New building approved

    Filing B01295753-S3 reached an approved status.

    06
  7. Permit recorded for new building

    DOB lists a first permit date for B01295753-S3. That is not by itself confirmation of activity on site.

    07
  8. New building now approved

    The latest status recorded for B01295753-S3 is “Permit Entire.”

    08
  9. Permit recorded for new building

    DOB lists a first permit date for B01295753-S4. That is not by itself confirmation of activity on site.

    09
  10. New building now approved

    The latest status recorded for B01295753-S4 is “Permit Entire.”

    010
  11. Alteration filed

    Installation of temporary roof protection as per plans. no change in use, egress or occupancy. Filing B01457021-I1.

    011
  12. Alteration filed

    Installation of temporary overhead protection as per plans. no change in use, egress or occupancy. Filing B01457015-I1.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B01457021-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration now approved

    The latest status recorded for B01457021-I1 is “Permit Entire.”

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B01457015-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration now approved

    The latest status recorded for B01457015-I1 is “Permit Entire.”

    016
  17. Alteration filed

    Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B01457027-I1.

    017
  18. Alteration approved

    Filing B01457027-I1 reached an approved status.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for B01457027-I1. That is not by itself confirmation of activity on site.

    019
  20. Alteration filed

    Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy. Filing B01460391-I1.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B01460391-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration now approved

    The latest status recorded for B01460391-I1 is “Permit Entire.”

    022
  23. Alteration filed

    Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B01461524-I1.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B01461524-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration now approved

    The latest status recorded for B01461524-I1 is “Permit Entire.”

    025
  26. New building approved

    Filing B01295753-S9 reached an approved status.

    026
  27. New building now approved

    The latest status recorded for B01295753-S9 is “Approved.”

    027
  28. Alteration filed

    Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B01457027-P1.

    028
  29. Alteration approved

    Filing B01457027-P1 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B01457027-P1 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for B01457027-I1 is “Permit Entire.”

    031
  32. Alteration filed

    Installation of temporary needle beam as per plans. no change in use, egress or occupancy. Filing B01464034-I1.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for B01464034-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration now approved

    The latest status recorded for B01464034-I1 is “Permit Entire.”

    034
  35. New building approved

    Filing B01295753-S6 reached an approved status.

    035
  36. Permit recorded for new building

    DOB lists a first permit date for B01295753-S6. That is not by itself confirmation of activity on site.

    036
  37. New building now approved

    The latest status recorded for B01295753-S6 is “Permit Entire.”

    037