DOB filing B00362559-I1
Alteration filing at 868 New York Avenue
Building record · BIN 3108518
868 New York Avenue, Brooklyn, NY 11203
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3108518
868 New York Avenue
East Flatbush-Erasmus, Brooklyn
A consolidated public-record view · updated Aug 25, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1910, with 10 homes, on a 2,007 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3108518. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 4 recorded as completed, 7 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 868 New York Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Install Temporary wood Construction Fence. No change to egress, occupancy or use. Filing B00367606-I1.
Install new plumbing fixtures throughout and associated sanitary, vent, hot water, cold water and re-circulation piping as shown on floor plans. Filing B00362559-I1.
Install wet pipe sprinkler systems throughout. Filing B00352155-I1.
Install Mechanical systems and associated components and piping throughout. Filing B00352170-I1.
Filing B00367606-I1 reached an approved status.
DOB lists a first permit date for B00367606-I1. That is not by itself confirmation of activity on site.
Filing B00362559-I1 reached an approved status.
Filing B00352170-I1 reached an approved status.
Filing B00352155-I1 reached an approved status.
Structural framing of existing cellar and two floors for horizontal and vertical extension, as per alt1 #321588616. Filing B00352161-I1.
Filing B00352161-I1 reached an approved status.
The latest status recorded for B00352170-I1 is “Approved.”
Install new plumbing fixtures throughout and associated sanitary, vent, hot water, cold water and re-circulation piping as shown on floor plans. Filing B00362559-P1.
Install Plumbing fixtures and wet pipe sprinkler systems throughout. Filing B00352155-P1.
Filing B00362559-P1 reached an approved status.
The latest status recorded for B00362559-P1 is “Approved.”
DOB lists a first permit date for B00352161-I1. That is not by itself confirmation of activity on site.
Filing B00352155-P1 reached an approved status.
The latest status recorded for B00352155-P1 is “Approved.”
Install new plumbing fixtures throughout and associated sanitary, vent, hot water, cold water and re-circulation piping as shown on floor plans. Filing B00362559-P2.
Filing B00362559-P2 reached an approved status.
The latest status recorded for B00362559-P2 is “Approved.”
DOB lists a first permit date for B00362559-I1. That is not by itself confirmation of activity on site.
Install Plumbing fixtures and wet pipe sprinkler systems throughout. Filing B00352155-P2.
Filing B00352155-P2 reached an approved status.
The latest status recorded for B00352155-P2 is “Approved.”
DOB lists a first permit date for B00352155-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00367606-I1.
The latest status recorded for B00367606-I1 is “LOC Issued.”
Install new plumbing fixtures throughout and associated sanitary, vent, hot water, cold water and re-circulation piping as shown on floor plans. Filing B00362559-P3.
Install wet pipe sprinkler systems throughout. Filing B00352155-P3.
Filing B00362559-P3 reached an approved status.
The latest status recorded for B00362559-P3 is “Approved.”
Filing B00352155-P3 reached an approved status.
The latest status recorded for B00352155-P3 is “Approved.”
DOB recorded a sign-off for B00352161-I1.
The latest status recorded for B00352161-I1 is “LOC Issued.”
DOB recorded a sign-off for B00352155-I1.
The latest status recorded for B00352155-I1 is “LOC Issued.”
DOB recorded a sign-off for B00362559-I1.
The latest status recorded for B00362559-I1 is “LOC Issued.”