DOB filing B00902739-Z1
New building at 757 Flatbush Avenue
Building record · BIN 3116189
757 Flatbush Avenue, Brooklyn, NY 11226
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3116189
757 Flatbush Avenue
Flatbush, Brooklyn
A consolidated public-record view · updated Sep 28, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a vacant land on a 5,541 sq ft lot.
The apartments
12 condominium apartments are assessed on this block, and the typical one is 1,377 sq ft (128 m²). They run from 73 to 347 m².
The city values the typical one at $381,111. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
2 apartments on this tax block changed hands in the year the city last published, at a median of $615,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
NERE FLATBUSH MANAGEMENT LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 30 notices on file; the most recent was issued Jun 20, 2023.
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3116189. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 new building, 5 alteration filing. Its latest status categories are 1 under review, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 757 Flatbush Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Support of excavation associated with New Building. Filing B00902739-S5.
Filing B00902739-S5 reached an approved status.
Mechanical work in conjunction with proposed 9 story mixed use New Building. Filing B00902739-S2.
Filing B00902739-S2 reached an approved status.
DOB lists a first permit date for B00902739-S5. That is not by itself confirmation of activity on site.
Filing for 10 feet tall temporary construction plywood fence in conjuction with dobnow job: b00902739-i1. no change in use, egress and occupancy. Filing B01286075-I1.
Filing B01286075-I1 reached an approved status.
DOB lists a first permit date for B01286075-I1. That is not by itself confirmation of activity on site.
Mechanical work in conjunction with proposed 9 story mixed use New Building. Filing B00902739-P9.
This application is filed for a temporary use permit for a sales office pursuant to section AC 28-111 and BB 2010-002. Temporary use permit is for 90 days. Filing B01399549-I1.
Filing B01399549-I1 reached an approved status.
Proposed sprinkler protection for temporary sales office and model unit. No change to egress, use and occupancy. Filing B01399549-S1.
Filing B01399549-S1 reached an approved status.
DOB lists a first permit date for B01399549-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01399549-I1 is “Permit Entire.”
Filing B00902739-P9 reached an approved status.
The latest status recorded for B00902739-P9 is “Approved.”
DOB lists a first permit date for B00902739-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B00902739-S2 is “Permit Entire.”
The latest status recorded for B00902739-S5 is “Permit Entire.”
Proposed sprinkler protection for temporary sales office and model unit. No change to egress, use and occupancy. Filing B01399549-P1.
The latest status recorded for B01286075-I1 is “Permit Entire.”
Filing B01399549-P1 reached an approved status.
The latest status recorded for B01399549-P1 is “Approved.”
The latest status recorded for B01399549-S1 is “Approved.”
Installation of supported scaffolding for new building exterior works. No change in egress, use and occupancy. Filing B01462486-I1.
Install temporary standpipe in connection with 9 story new building. Filing B00902739-Z1.
Filing B01462486-I1 reached an approved status.
The latest status recorded for B01462486-I1 is “Approved.”
The latest status recorded for B00902739-Z1 is “Plan Examiner Review.”