DOB filing B00452929-P1
Alteration filing at 309 East 19 Street
Building record · BIN 3118811
309 East 19 Street, Brooklyn, NY 11226
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3118811
309 East 19 Street
Flatbush, Brooklyn
A consolidated public-record view · updated Feb 21, 2023
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1935, with 42 homes, on a 10,660 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 7 open notices on record for this building, out of 24 notices on file; the most recent was issued Sep 6, 2019.
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
4 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3118811. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 309 East 19 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Existing apartments 6F & 6G on 6th floor to be reconfigured into units 6NF & 6NG size and dimensions of new apartments do not match size and configuration of the prior units. Plumbing work under separate application. No change in use, egress or occupancy. Filing B00452929-I1.
Filing B00452929-I1 reached an approved status.
Plumbing work, relocation of existing plumbing fixtures, relocation of existing gas ranges, installation at new plumbing fixtures at Apt's 6NF and 6NG. No change in use, egress or occupancy. Filing B00452929-S1.
DOB lists a first permit date for B00452929-I1. That is not by itself confirmation of activity on site.
Filing B00452929-S1 reached an approved status.
DOB lists a first permit date for B00452929-S1. That is not by itself confirmation of activity on site.
The latest status recorded for B00452929-I1 is “Permit Entire.”
Plumbing work, relocation of existing plumbing fixtures, relocation of existing gas ranges, installation at new plumbing fixtures at Apt's 6NF and 6NG. No change in use, egress or occupancy. Filing B00452929-P1.
Filing B00452929-P1 reached an approved status.
The latest status recorded for B00452929-P1 is “Approved.”
The latest status recorded for B00452929-S1 is “Permit Entire.”