DOB filing B00298838-P1
Alteration filing at 1702 60 Street
Building record · BIN 3132091
1702 60 Street, Brooklyn, NY 11204
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 15 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3132091
1702 60 Street
Mapleton-Midwood (West), Brooklyn
A consolidated public-record view · updated Sep 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story place of public assembly built in 1954, on a 13,116 sq ft lot.
The apartments
24 condominium apartments are assessed on this block, and the typical one is 1,479 sq ft (137 m²). They run from 113 to 201 m².
The city values the typical one at $464,750. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
1 apartment on this tax block changed hands in the year the city last published, at a median of $1,825,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
THE MOSES NEUMAN TRUST
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 20 notices on file; the most recent was issued Aug 16, 1993.
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3132091. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 15 alteration filing. Its latest status categories are 12 approved, 2 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1702 60 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 15 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Replacement of existing rooftop HVAC and split system air ac units and all new controls. Filing B00298829-I1.
Install new gas piping from cellar to roof top HVAC units. Filing B00298838-I1.
Filing B00298838-I1 reached an approved status.
Filing B00298829-I1 reached an approved status.
Install Structural Steel dunnage support for RTUs on roof. New steel posts for sound bearer and lentils for new duct openings. Filing B00364269-I1.
Connect to existing gas piping for replacement gas burner on existing low pressure boiler. no change in use, egress or occupancy. Filing B00476261-I1.
Replace gas burner on existing low pressure boiler. no change in use, egress or occupancy. Filing B00476115-I1.
DOB lists a first permit date for B00476261-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00476115-I1. That is not by itself confirmation of activity on site.
Install new chimney liner as per plans. no change in use, egress or occupancy. Filing B00476220-I1.
Filing B00476220-I1 reached an approved status.
DOB lists a first permit date for B00476220-I1. That is not by itself confirmation of activity on site.
Install 5 roof drains. Cut back and cap existing 4" storm piping from roof drains to storm leader. Install new 4" leader and connect to existing UDG piping at existing area drain. . No change to use egress or occupancy under this application. Filing B00495387-I1.
Column repairs , reinforcement of sealed beam , reinforcement of existing spandrel beam, installation of guard rails into existing parapet. no change to use, egress, or occupancy. Filing B00495369-I1.
Filing B00495387-I1 reached an approved status.
The latest status recorded for B00364269-I1 is “Objections.”
Filing B00495369-I1 reached an approved status.
Replace gas burner on existing low pressure boiler. no change in use, egress or occupancy. Filing B00476115-P1.
Install new chimney liner as per plans. no change in use, egress or occupancy. Filing B00476220-P1.
Connect to existing gas piping for replacement gas burner on existing low pressure boiler. no change in use, egress or occupancy. Filing B00476261-P1.
Filing B00476115-P1 reached an approved status.
The latest status recorded for B00476115-P1 is “Approved.”
Filing B00476220-P1 reached an approved status.
The latest status recorded for B00476220-P1 is “Approved.”
Filing B00476261-P1 reached an approved status.
The latest status recorded for B00476261-P1 is “Approved.”
DOB recorded a sign-off for B00476115-I1.
The latest status recorded for B00476115-I1 is “LOC Issued.”
The latest status recorded for B00476220-I1 is “Permit Entire.”
DOB recorded a sign-off for B00476261-I1.
The latest status recorded for B00476261-I1 is “LOC Issued.”
DOB lists a first permit date for B00298829-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00298838-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00495369-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00495387-I1. That is not by itself confirmation of activity on site.
Column repairs , reinforcement of sealed beam , reinforcement of existing spandrel beam, installation of guard rails into existing parapet. no change to use, egress, or occupancy. Filing B00495369-P1.
Filing B00495369-P1 reached an approved status.
The latest status recorded for B00495369-P1 is “Approved.”
Install 5 roof drains. Cut back and cap existing 4" storm piping from roof drains to storm leader. Install new 4" leader and connect to existing UDG piping at existing area drain. . No change to use egress or occupancy under this application. Filing B00495387-P1.
Filing B00495387-P1 reached an approved status.
The latest status recorded for B00495387-P1 is “Approved.”
Install new gas piping from cellar to roof top HVAC units. Filing B00298838-P1.
Replacement of existing rooftop HVAC and split system air ac units and all new controls. Filing B00298829-P1.
Filing B00298829-P1 reached an approved status.
The latest status recorded for B00298829-P1 is “Approved.”
The latest status recorded for B00298829-I1 is “Permit Entire.”
The latest status recorded for B00495387-I1 is “Permit Entire.”
The latest status recorded for B00495369-I1 is “Permit Entire.”
Filing B00298838-P1 reached an approved status.
The latest status recorded for B00298838-P1 is “Approved.”
The latest status recorded for B00298838-I1 is “Permit Entire.”