DOB filing B00301228-I1
Alteration filing at 4804 13 Avenue
Building record · BIN 3137420
4804 13 Avenue, Brooklyn, NY 11219
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 29 independently sourced records, including 20 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3137420
4804 13 Avenue
Borough Park, Brooklyn
A consolidated public-record view · updated Jun 8, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 2-story store building built in 1930, on a 4,200 sq ft lot.
What it sold for
1 apartment on this tax block changed hands in the year the city last published, at a median of $1,100,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 9 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3137420. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 29 alteration filing. Its latest status categories are 9 recorded as completed, 20 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 4804 13 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 29 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work filed as per plans and provide new sprinkler system to entire building according to NYC bc and n.f.p.a.#13r-2007. no standpipe required. Filing B00301228-I1.
Mechanical work filed as per plans. Filing B00310008-I1.
Structural work as per plans filed, in conjunction with alt1 job 321966066. Filing B00292004-I1.
Filing B00310008-I1 reached an approved status.
Filing B00301228-I1 reached an approved status.
Mechanical work filed as per plans. Filing B00310008-P1.
Plumbing work filed as per plans and provide new sprinkler system to entire building according to NYC bc and n.f.p.a.#13r-2007. no standpipe required. Filing B00301228-P1.
Filing B00310008-P1 reached an approved status.
Filing B00301228-P1 reached an approved status.
The latest status recorded for B00301228-P1 is “Approved.”
Install temp construction fence as per plans filed. Filing B00486478-I1.
Filing B00486478-I1 reached an approved status.
DOB lists a first permit date for B00486478-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00495164-I1.
DOB lists a first permit date for B00495164-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00495193-I1.
DOB lists a first permit date for B00495193-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00494943-I1.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00494944-I1.
DOB lists a first permit date for B00494943-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00494944-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00495164-P1.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00494943-P1.
Filing B00495164-P1 reached an approved status.
Filing B00494943-P1 reached an approved status.
The latest status recorded for B00494943-P1 is “Approved.”
Filing B00292004-I1 reached an approved status.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00495193-P1.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00494944-P1.
Filing B00494944-P1 reached an approved status.
The latest status recorded for B00494944-P1 is “Approved.”
Filing B00495193-P1 reached an approved status.
Soe work as per plans. Filing B00614931-I1.
Filing B00614931-I1 reached an approved status.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00495164-P2.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00495193-P2.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00494943-P2.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00494944-P2.
Filing B00495164-P2 reached an approved status.
Filing B00495193-P2 reached an approved status.
Filing B00494943-P2 reached an approved status.
The latest status recorded for B00494943-P2 is “Approved.”
Filing B00494944-P2 reached an approved status.
The latest status recorded for B00494944-P2 is “Approved.”
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00494944-P3.
Filing B00494944-P3 reached an approved status.
The latest status recorded for B00494944-P3 is “Approved.”
DOB lists a first permit date for B00301228-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00495193-P3.
DOB lists a first permit date for B00292004-I1. That is not by itself confirmation of activity on site.
Structural work as per plans filed, in conjunction with alt1 job 321966066. Filing B00292004-P1.
Filing B00495193-P3 reached an approved status.
DOB lists a first permit date for B00614931-I1. That is not by itself confirmation of activity on site.
Filing B00292004-P1 reached an approved status.
The latest status recorded for B00292004-P1 is “Approved.”
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00494943-P3.
Filing B00494943-P3 reached an approved status.
The latest status recorded for B00494943-P3 is “Approved.”
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00494944-P4.
Filing B00494944-P4 reached an approved status.
The latest status recorded for B00494944-P4 is “Approved.”
DOB lists a first permit date for B00310008-I1. That is not by itself confirmation of activity on site.
Plumbing work filed as per plans and provide new sprinkler system to entire building according to NYC bc and n.f.p.a.#13r-2007. no standpipe required. Filing B00301228-P3.
Filing B00301228-P3 reached an approved status.
DOB recorded a sign-off for B00495193-I1.
Plumbing work filed as per plans and provide new sprinkler system to entire building according to NYC bc and n.f.p.a.#13r-2007. no standpipe required. Filing B00301228-P4.
Filing B00301228-P4 reached an approved status.
Plumbing work filed as per plans and provide new sprinkler system to entire building according to NYC bc and n.f.p.a.#13r-2007. no standpipe required. Filing B00301228-P6.
Filing B00301228-P6 reached an approved status.
DOB recorded a sign-off for B00495164-I1.
DOB recorded a sign-off for B00494943-I1.
The latest status recorded for B00494943-I1 is “LOC Issued.”
DOB recorded a sign-off for B00494944-I1.
The latest status recorded for B00494944-I1 is “LOC Issued.”
Plumbing work filed as per plans and provide new sprinkler system to entire building according to NYC bc and n.f.p.a.#13r-2007. no standpipe required. Filing B00301228-P7.
Filing B00301228-P7 reached an approved status.
DOB recorded a sign-off for B00486478-I1.
The latest status recorded for B00486478-I1 is “LOC Issued.”
DOB recorded a sign-off for B00292004-I1.
The latest status recorded for B00292004-I1 is “LOC Issued.”
The latest status recorded for B00495164-I1 is “LOC Issued.”
The latest status recorded for B00495164-P1 is “Approved.”
The latest status recorded for B00495164-P2 is “Approved.”
The latest status recorded for B00495193-I1 is “LOC Issued.”
The latest status recorded for B00495193-P1 is “Approved.”
The latest status recorded for B00495193-P2 is “Approved.”
The latest status recorded for B00495193-P3 is “Approved.”
DOB recorded a sign-off for B00614931-I1.
The latest status recorded for B00614931-I1 is “LOC Issued.”
Mechanical work filed as per plans. Filing B00310008-P2.
Filing B00310008-P2 reached an approved status.
The latest status recorded for B00310008-P1 is “Approved.”
The latest status recorded for B00310008-P2 is “Approved.”
DOB recorded a sign-off for B00310008-I1.
The latest status recorded for B00310008-I1 is “LOC Issued.”
DOB recorded a sign-off for B00301228-I1.
The latest status recorded for B00301228-I1 is “LOC Issued.”
The latest status recorded for B00301228-P3 is “Approved.”
The latest status recorded for B00301228-P4 is “Approved.”
The latest status recorded for B00301228-P6 is “Approved.”
The latest status recorded for B00301228-P7 is “Approved.”