Building record · BIN 3137601

4915 10 Avenue

4915 10 Avenue, Brooklyn, NY 11219

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3137601

4915 10 Avenue

Sunset Park (East)-Borough Park (West), Brooklyn

A consolidated public-record view · updated Sep 1, 2026

DOB filings
10
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records8
First included filingDec 2, 2019
Latest recorded changeSep 1, 2026

The lot

What is already here?

The lot holds a 9-story health facility built in 1930, on a 38,600 sq ft lot.

Built
1930
Floors
9
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R6
Lot area
38,600 sq ft
Building area
292,230 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 172 notices on file; the most recent was issued Jun 12, 2021.

  • Elevator

    Issued Jun 12, 2021

  • Elevator

    Issued Sep 12, 2020

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 3, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3137601. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 8 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 2, 2019
Latest recorded change
Sep 1, 2026
Highest proposed story count
9 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 4915 10 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of cogeneration system, installation of (2) new gas fired cogen recip, gas piping installations. no change in use, egress or occupancy. Filing B00266432-I1.

    01
  2. Alteration approved

    Filing B00266432-I1 reached an approved status.

    02
  3. Alteration filed

    Installation of cogenerators with associated mechanical piping and radiators, no change in use egress or occupancy. Filing B00266518-I1.

    03
  4. Alteration approved

    Filing B00266518-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00266518-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    The first floor scope of work is duct and diffuser modifications, existing ceiling cassette relocations, and addition of a toilet exhaust fan (on low roof),all mechanical equipment was approved under a previous NYC DOB application 320446479. Filing B00265103-I1.

    06
  7. Alteration filed

    Installation and relocation of plumbing fixtures. also relocating 113 sprinkler heads and install 11 new heads. Filing B00265066-I1.

    07
  8. Alteration approved

    Filing B00265103-I1 reached an approved status.

    08
  9. Alteration now approved

    The latest status recorded for B00266518-I1 is “Permit Entire.”

    09
  10. Alteration filed

    Installation of cogeneration system, installation of (2) new gas fired cogen recip, gas piping installations. no change in use, egress or occupancy. Filing B00266432-P1.

    010
  11. Alteration approved

    Filing B00266432-P1 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00266432-P1 is “Approved.”

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00265103-I1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00266432-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Installation of cogeneration system, installation of (2) new gas fired cogen recip, gas piping installations. no change in use, egress or occupancy. Filing B00266432-P3.

    015
  16. Alteration approved

    Filing B00266432-P3 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00266432-P3 is “Approved.”

    017
  18. Alteration filed

    The first floor scope of work is duct and diffuser modifications, existing ceiling cassette relocations, and addition of a toilet exhaust fan (on low roof),all mechanical equipment was approved under a previous NYC DOB application 320446479. Filing B00265103-P1.

    018
  19. Alteration approved

    Filing B00265103-P1 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for B00265103-P1 is “Approved.”

    020
  21. Alteration signed off

    DOB recorded a sign-off for B00265103-I1.

    021
  22. Alteration now completed

    The latest status recorded for B00265103-I1 is “LOC Issued.”

    022
  23. Alteration approved

    Filing B00265066-I1 reached an approved status.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00265066-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Installation of cogeneration system, installation of (2) new gas fired cogen recip, gas piping installations. no change in use, egress or occupancy. Filing B00266432-P4.

    025
  26. Alteration approved

    Filing B00266432-P4 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for B00266432-P4 is “Approved.”

    027
  28. Alteration signed off

    DOB recorded a sign-off for B00265066-I1.

    028
  29. Alteration now completed

    The latest status recorded for B00265066-I1 is “LOC Issued.”

    029
  30. Alteration filed

    Installation of cogeneration system, installation of (2) new gas fired cogen recip, gas piping installations. no change in use, egress or occupancy. Filing B00266432-P5.

    030
  31. Alteration now approved

    The latest status recorded for B00266432-I1 is “Permit Entire.”

    031
  32. Alteration approved

    Filing B00266432-P5 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for B00266432-P5 is “Approved.”

    033
  34. Alteration filed

    Filing for modification of existing sprinkler for new microbiology lab system to include, but not limited to, removal and new sprinkler heads, and new piping. No change in use, egress, or occupancy. Filing B01318060-S3.

    034
  35. Alteration approved

    Filing B01318060-S3 reached an approved status.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for B01318060-S3. That is not by itself confirmation of activity on site.

    036
  37. Alteration now approved

    The latest status recorded for B01318060-S3 is “Permit Entire.”

    037