Building record · BIN 3140215

833 58 Street

833 58 Street, Brooklyn, NY 11220

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3140215

833 58 Street

Sunset Park (East)-Borough Park (West), Brooklyn

A consolidated public-record view · updated Jun 14, 2024

DOB filings
6
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records6
First included filingOct 20, 2020
Latest recorded changeJun 14, 2024

The lot

What is already here?

The lot holds a 4-story office building built in 2001, on a 4,007 sq ft lot.

Built
2001
Floors
4
Residential units
2
Building type
Office building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
4,007 sq ft
Building area
15,280 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 7 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3140215. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 6 alteration filing. Its latest status categories are 6 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 20, 2020
Latest recorded change
Jun 14, 2024
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 833 58 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Install a new HVAC split system in the existing Dr. Office. Filing B00416502-I1.

    01
  2. Alteration filed

    Replace, relocate and add sprinkler heads and piping on the existing system. Filing B00416507-I1.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00416502-I1. That is not by itself confirmation of activity on site.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00416507-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Install new plumbing fixtures as per plans, cap, and remove as per plans. Filing B00416503-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00416503-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Install a new HVAC split system in the existing Dr. Office. Filing B00416502-P1.

    07
  8. Alteration filed

    Install new plumbing fixtures as per plans, cap, and remove as per plans. Filing B00416503-P1.

    08
  9. Alteration filed

    Replace, relocate and add sprinkler heads and piping on the existing system. Filing B00416507-P1.

    09
  10. Alteration now approved

    The latest status recorded for B00416503-I1 is “Permit Entire.”

    010
  11. Alteration approved

    Filing B00416503-P1 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00416503-P1 is “Approved.”

    012
  13. Alteration now approved

    The latest status recorded for B00416507-I1 is “Permit Entire.”

    013
  14. Alteration approved

    Filing B00416507-P1 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for B00416507-P1 is “Approved.”

    015
  16. Alteration now approved

    The latest status recorded for B00416502-I1 is “Permit Entire.”

    016
  17. Alteration approved

    Filing B00416502-P1 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00416502-P1 is “Approved.”

    018