DOB filing B00275274-I1
Alteration filing at 9419 5 Avenue
Building record · BIN 3155639
9419 5 Avenue, Brooklyn, NY 11209
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3155639
9419 5 Avenue
Bay Ridge, Brooklyn
A consolidated public-record view · updated Mar 17, 2021
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3155639. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 3 recorded as completed, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 9419 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Sprinkler Work for First and Second Floors. Filing B00275274-I1.
Remove (1)cooking range; existing(1) hwh & 2 gas furnace to remain. install (3)water closet, (3)lavatory, (3) floor drain @ 1st floor floor as per plan. install(4) water closet, (4)lavatory, (5)floor drain. (1) non-residential sink @ 2nd floor as per plan. Filing B00255258-I1.
Filing B00255258-I1 reached an approved status.
Install construction fence in-conjunction with alt 1 job# 321597713. Filing B00281024-I1.
Filing B00275274-I1 reached an approved status.
DOB lists a first permit date for B00255258-I1. That is not by itself confirmation of activity on site.
Filing B00281024-I1 reached an approved status.
DOB lists a first permit date for B00275274-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00281024-I1. That is not by itself confirmation of activity on site.
Install (3) new water closet, (3) new lavatory, (3) new floor drain @ 1st floor floor as per plan. install (4) new water closet, (4) new lavatory, (5) new floor drain. (1) non-residential sink @ 2nd floor as per plan. Filing B00255258-P1.
Filing B00255258-P1 reached an approved status.
Install (3) new water closet, (3) new lavatory, (3) new floor drain @ 1st floor floor as per plan. install (4) new water closet, (4) new lavatory, (5) new floor drain. (1) non-residential sink @ 2nd floor as per plan. Filing B00255258-P2.
Filing B00255258-P2 reached an approved status.
The latest status recorded for B00255258-P1 is “Approved.”
The latest status recorded for B00255258-P2 is “Approved.”
Remove (1)cooking range; existing(1) hwh & 2 gas furnace to remain. install (3)water closet, (3)lavatory, (3) floor drain @ 1st floor floor as per plan. install(4) water closet, (4)lavatory, (5)floor drain. (1) non-residential sink @ 2nd floor as per plan. Filing B00255258-P3.
Filing B00255258-P3 reached an approved status.
The latest status recorded for B00255258-P3 is “Approved.”
DOB recorded a sign-off for B00255258-I1.
The latest status recorded for B00255258-I1 is “LOC Issued.”
DOB recorded a sign-off for B00281024-I1.
The latest status recorded for B00281024-I1 is “LOC Issued.”
DOB recorded a sign-off for B00275274-I1.
The latest status recorded for B00275274-I1 is “LOC Issued.”