Building record · BIN 3169131

8891 15 Avenue

8891 15 Avenue, Brooklyn, NY 11228

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3169131

8891 15 Avenue

Bath Beach, Brooklyn

A consolidated public-record view · updated Mar 2, 2026

DOB filings
7
Active-status
7
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings7
Open or active-status records7
First included filingMar 19, 2021
Latest recorded changeMar 2, 2026

The lot

What is already here?

The lot holds a 2-story two-family home built in 1950, on a 3,867 sq ft lot.

  1. Floor 2Homes2 homes are recorded on this lot — about 2 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as one and two family homes.
  • Street levelOne and two family homes
  • Homes2 recorded on the lot
  • Above the southern skylineFrom about floor 4 — the tallest thing within 60 m to the south is 10.7 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 8.1 m over 2 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1950
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R4
Lot area
3,867 sq ft
Building area
3,776 sq ft

Owner of record

BAY 11TH LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 9 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3169131. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 7 alteration filing. Its latest status categories are 7 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 19, 2021
Latest recorded change
Mar 2, 2026
Highest proposed story count
2 stories
Highest proposed unit count
2 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 8891 15 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    To file soe in conjunction with alt-1 application job#321919064. Filing B00486514-I1.

    01
  2. Alteration filed

    To file structural, foundation, earthwork and partial demolition work in conjunction with alt-1 application job#321919064. Filing B00486481-I1.

    02
  3. Alteration approved

    Filing B00486481-I1 reached an approved status.

    03
  4. Alteration filed

    To file "FN" work type to install new construction fence. Filing B00504564-I1.

    04
  5. Alteration approved

    Filing B00504564-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00504564-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration approved

    Filing B00486514-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00486481-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00486514-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    To file soe in conjunction with alt-1 application job#321919064. Filing B00486514-P1.

    010
  11. Alteration approved

    Filing B00486514-P1 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00486514-P1 is “Approved.”

    012
  13. Alteration filed

    To file structural, foundation, earthwork and partial demolition work in conjunction with alt-1 application job#321919064. Filing B00486481-P2.

    013
  14. Alteration approved

    Filing B00486481-P2 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for B00486481-P2 is “Approved.”

    015
  16. Alteration filed

    To file structural, foundation, earthwork and partial demolition work in conjunction with alt-1 application job#321919064. Filing B00486481-P3.

    016
  17. Alteration approved

    Filing B00486481-P3 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00486481-P3 is “Approved.”

    018
  19. Alteration now approved

    The latest status recorded for B00486514-I1 is “Permit Entire.”

    019
  20. Alteration filed

    To file structural, foundation, earthwork and partial demolition work in conjunction with alt-1 application job#321919064. Filing B00486481-P4.

    020
  21. Alteration approved

    Filing B00486481-P4 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00486481-P4 is “Approved.”

    022
  23. Alteration now approved

    The latest status recorded for B00504564-I1 is “Permit Entire.”

    023
  24. Alteration now approved

    The latest status recorded for B00486481-I1 is “Permit Entire.”

    024