Building record · BIN 3172628

2345 60 Street

2345 60 Street, Brooklyn, NY 11204

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 0 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3172628

2345 60 Street

Mapleton-Midwood (West), Brooklyn

A consolidated public-record view · updated May 26, 2021

DOB filings
6
Active-status
0
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records0
First included filingMar 13, 2019
Latest recorded changeMay 26, 2021

The lot

What is already here?

The lot holds a 7-story condominium built in 2019, with 18 homes, on a 4,486 sq ft lot.

  1. Floors 2–7Homes18 homes are recorded on this lot — about 3 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as mixed residential and commercial, so this floor is where the commercial space is.
  • Street levelMixed residential and commercial
  • Homes18 recorded on the lot
  • Above the southern skylineFrom about floor 9 — the tallest thing within 60 m to the south is 24.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 22.9 m over 7 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2019
Floors
7
Residential units
18
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
4,486 sq ft
Building area
16,889 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

On the market here

2 homes at this address are currently listed for sale by Coldwell Banker and RE/MAX. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.

Homes listed for sale or rent at 2345 60 Street
UnitRoomsSizePricePer sq ftListed by
Unit 6BFor sale2 bd · 1 ba719 sq ft67 m²$675,000$939Coldwell Banker
Unit 6BFor salePrice not readRE/MAX

Read from the brokerages’ own published listings on October 7, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3172628. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 6 alteration filing. Its latest status categories are 6 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 13, 2019
Latest recorded change
May 26, 2021
Highest proposed story count
Not stated
Highest proposed unit count
18 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2345 60 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Install temporary construction fence in conjunction with job no. 321513028 and 321513037. no change in use, egress, and occupancy. Filing B00074041-I1.

    01
  2. Alteration approved

    Filing B00074041-I1 reached an approved status.

    02
  3. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00141660-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00141660-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Submit curb cut work in conjunction with NB application #321385158. Filing B00150393-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00074041-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration signed off

    DOB recorded a sign-off for B00141660-I1.

    07
  8. Alteration filed

    Propose temprary construction fence in conjunction with nb#321385158. no change in use,egress, and occupancy. Filing B00188687-I1.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00188687-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration approved

    Filing B00150393-I1 reached an approved status.

    010
  11. Alteration filed

    Installation of sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00242706-I1.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00242706-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00264348-I1.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00264348-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration now completed

    The latest status recorded for B00141660-I1 is “LOC Issued.”

    015
  16. Alteration signed off

    DOB recorded a sign-off for B00074041-I1.

    016
  17. Alteration now completed

    The latest status recorded for B00074041-I1 is “LOC Issued.”

    017
  18. Alteration signed off

    DOB recorded a sign-off for B00188687-I1.

    018
  19. Alteration now completed

    The latest status recorded for B00188687-I1 is “LOC Issued.”

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for B00150393-I1. That is not by itself confirmation of activity on site.

    020
  21. Alteration signed off

    DOB recorded a sign-off for B00264348-I1.

    021
  22. Alteration now completed

    The latest status recorded for B00264348-I1 is “LOC Issued.”

    022
  23. Alteration signed off

    DOB recorded a sign-off for B00242706-I1.

    023
  24. Alteration now completed

    The latest status recorded for B00242706-I1 is “LOC Issued.”

    024
  25. Alteration signed off

    DOB recorded a sign-off for B00150393-I1.

    025
  26. Alteration now completed

    The latest status recorded for B00150393-I1 is “LOC Issued.”

    026