Building record · BIN 3175285

166 Kings Highway

166 Kings Highway, Brooklyn, NY 11223

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3175285

166 Kings Highway

Gravesend (West), Brooklyn

A consolidated public-record view · updated Apr 3, 2023

DOB filings
2
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records1
First included filingDec 12, 2018
Latest recorded changeApr 3, 2023

The lot

What is already here?

The lot holds a 3-story educational building built in 2019, on a 17,421 sq ft lot.

Built
2019
Last altered
2019
Floors
3
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R7A
Lot area
17,421 sq ft
Building area
34,975 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 15 notices on file; the most recent was issued Apr 25, 2023.

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jan 17, 2020 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3175285. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 1 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 12, 2018
Latest recorded change
Apr 3, 2023
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 166 Kings Highway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of temporary construction plywood fence as per plans during construction. no change in use, egress or occupancy. hoist to comply with chapter 33 of NYC building code of 2014. Filing B00107188-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00107188-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of sidewalk shed and pipe scaffold and construction fence, overhead protection, roof protection as per plans. sidewalk shed live load 300 psf and all equipments shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this application. Filing B00143350-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00143350-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration now approved

    The latest status recorded for B00143350-I1 is “Permit Entire.”

    05
  6. Alteration signed off

    DOB recorded a sign-off for B00107188-I1.

    06
  7. Alteration now completed

    The latest status recorded for B00107188-I1 is “LOC Issued.”

    07