DOB filing B00645335-I1
New building at 815 Kings Highway
Building record · BIN 3177549
815 Kings Highway, Brooklyn, NY 11223
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3177549
815 Kings Highway
Gravesend (East)-Homecrest, Brooklyn
A consolidated public-record view · updated Aug 27, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 19-story elevator apartment building built in 2023, with 24 homes, on a 15,840 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 84 notices on file; the most recent was issued Nov 18, 2008.
Issued Nov 18, 2008
Issued Nov 5, 2007
Issued Aug 18, 2005
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3177549. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 17 new building, 4 alteration filing. Its latest status categories are 12 approved, 9 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 815 Kings Highway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Proposed construction fence. No change to use, egress or occupancy under this application. Filing B00075436-I1.
Filing B00075436-I1 reached an approved status.
Cap and removal of wet sprinkler system from penthouse to 1st level at existing 3-story building. this job is in conjunction with full demolition job#321805169. no change of use, egress, or occupancy under this application. Filing B00557557-I1.
DOB lists a first permit date for B00075436-I1. That is not by itself confirmation of activity on site.
Filing B00557557-I1 reached an approved status.
DOB lists a first permit date for B00557557-I1. That is not by itself confirmation of activity on site.
Installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. Filing B00589421-I1.
DOB lists a first permit date for B00589421-I1. That is not by itself confirmation of activity on site.
DEVELOPMENT HUB HELD AND ACCEPTED PROJECT DURING CONSULTATION ON 10/26/21. New mixed use building. Respectfully requesting initial zoning review for foundation approval pursuant to 28-104.2.5. Filing B00645335-I1.
Foundation for new building subsequent to new building filed under application # b00645335. Filing B00645335-S6.
Temporary Standpipe installation in conjunction with New Building. Filing B00645335-S8.
Curb cut 10' in width including splays serving parking entrance at East 9th Street. In conjunction with NB B00645335. Filing B00645335-S9.
Curb cut 10' in width including splays serving parking garage. In conjunction with NB B00645335. Filing B00645335-Z1.
Filing B00645335-S8 reached an approved status.
Filing B00645335-S6 reached an approved status.
Filing B00645335-S9 reached an approved status.
Filing B00645335-Z1 reached an approved status.
File PAA for Support of Excavation in conjunction with New Building in order to reflect feild condition. Filing B00645335-S2.
Installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. Filing B00589421-P1.
Filing B00589421-P1 reached an approved status.
The latest status recorded for B00589421-P1 is “Approved.”
Paa in order to reflect as-built condition prior to the final inspection. Filing B00645335-S4.
Sprinkler & standpipe system installation in conjunction with New Building. Filing B00645335-S5.
Filing B00645335-S2 reached an approved status.
DOB lists a first permit date for B00645335-S6. That is not by itself confirmation of activity on site.
Filing B00645335-S5 reached an approved status.
Filing B00645335-I1 reached an approved status.
DOB lists a first permit date for B00645335-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645335-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645335-S9. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645335-Z1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645335-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00645335-S8. That is not by itself confirmation of activity on site.
Mechanical systems installation in subsequent to New Building application. Filing B00645335-S3.
DOB recorded a sign-off for B00589421-I1.
The latest status recorded for B00589421-I1 is “LOC Issued.”
Filing B00645335-S4 reached an approved status.
DOB lists a first permit date for B00645335-S4. That is not by itself confirmation of activity on site.
Paa in order to reflect minor changes in architectural drawings and show underground piping and location of the detention tank as per approved dep sewer connections. Filing B00645335-P1.
Structural drawings subsequent to approved architectural plans B00645335-I1. Filing B00645335-S7.
Filing B00645335-P1 reached an approved status.
The latest status recorded for B00645335-P1 is “Approved.”
File PAA for Support of Excavation in conjunction with New Building in order to reflect feild condition. Filing B00645335-P2.
Filing B00645335-S7 reached an approved status.
Filing B00645335-P2 reached an approved status.
The latest status recorded for B00645335-P2 is “Approved.”
DOB lists a first permit date for B00645335-S7. That is not by itself confirmation of activity on site.
Filing B00645335-S3 reached an approved status.
DOB lists a first permit date for B00645335-S3. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00645335-S2.
The latest status recorded for B00645335-S2 is “LOC Issued.”
DOB recorded a sign-off for B00645335-S7.
The latest status recorded for B00645335-S7 is “LOC Issued.”
DOB recorded a sign-off for B00645335-S6.
The latest status recorded for B00645335-S6 is “LOC Issued.”
Paa in order to reflect as-built condition prior to the final inspection. Filing B00645335-P5.
Filing B00645335-P5 reached an approved status.
The latest status recorded for B00645335-P5 is “Approved.”
The latest status recorded for B00645335-S8 is “Permit Entire.”
Sprinkler & standpipe system installation in conjunction with New Building. Filing B00645335-P3.
Filing B00645335-P3 reached an approved status.
The latest status recorded for B00645335-P3 is “Approved.”
Sprinkler & standpipe system installation in conjunction with New Building. Filing B00645335-P9.
DEVELOPMENT HUB HELD AND ACCEPTED PROJECT DURING CONSULTATION ON 10/26/21. New mixed use building. Respectfully requesting initial zoning review for foundation approval pursuant to 28-104.2.5. Filing B00645335-P8.
Filing B00645335-P9 reached an approved status.
The latest status recorded for B00645335-P9 is “Approved.”
The latest status recorded for B00645335-S4 is “Permit Entire.”
The latest status recorded for B00645335-S5 is “Permit Entire.”
DOB recorded a sign-off for B00645335-S3.
The latest status recorded for B00645335-S3 is “LOC Issued.”
DOB recorded a sign-off for B00075436-I1.
The latest status recorded for B00075436-I1 is “LOC Issued.”
Filing B00645335-P8 reached an approved status.
The latest status recorded for B00645335-P8 is “Approved.”
DEVELOPMENT HUB HELD AND ACCEPTED PROJECT DURING CONSULTATION ON 10/26/21. New mixed use building. Respectfully requesting initial zoning review for foundation approval pursuant to 28-104.2.5. Filing B00645335-A1.
DOB recorded a sign-off for B00557557-I1.
The latest status recorded for B00557557-I1 is “LOC Issued.”
Filing B00645335-A1 reached an approved status.
The latest status recorded for B00645335-A1 is “Approved.”
DOB recorded a sign-off for B00645335-S9.
The latest status recorded for B00645335-S9 is “LOC Issued.”
DOB recorded a sign-off for B00645335-Z1.
The latest status recorded for B00645335-Z1 is “LOC Issued.”
The latest status recorded for B00645335-I1 is “Permit Entire.”