A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3196594
205 Sea Breeze Avenue
Coney Island-Sea Gate, Brooklyn
A consolidated public-record view · updated Nov 6, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1930, with 58 homes, on a 10,200 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 4 open notices on record for this building, out of 17 notices on file; the most recent was issued Feb 22, 2023.
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Issued Aug 30, 2013 — FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Issued Nov 12, 1997
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3196594. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 205 Sea Breeze Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modification of an existing SPRINT telecommunications site. - Rreplacement of (3) antennas, installation of (3) new antennas, (9) RRHs, as well as installing (1) equipment cabinet on an existing equipment platform located on the roof. The scope of work is in conformance with TTPN #5/98. Scope of work does not change occupancy, use or egress. Filing B00088239-I1.
Filing B00088239-I1 reached an approved status.
DOB lists a first permit date for B00088239-I1. That is not by itself confirmation of activity on site.
Modification to existing VERIZON telecommunications site. Remove and replace 2 antennas, install 2 new sectors (6 antennas) and 1 additional antenna (7 new antennas total), relocate 2 RRH units, replace 1 existing RRH unit, install 2 new RRH units, relocate 2 GPS units, and relocate 1 equipment cabinet on the roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy. Filing B00101220-I1.
Filing B00101220-I1 reached an approved status.
DOB lists a first permit date for B00101220-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00088239-I1 is “Permit Entire.”
Modification of existing Verizon site. Install new platform with equipment cabinets, remove existing equipment cabinet, replace 6 existing RRH units. In compliance with TPPN 5/98. Filing B00591507-I1.
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Service connection in the basement. Initial installation approved under application #320182468. Filing B00624473-I1.
Filing B00624473-I1 reached an approved status.
DOB lists a first permit date for B00624473-I1. That is not by itself confirmation of activity on site.
Filing B00591507-I1 reached an approved status.
DOB lists a first permit date for B00591507-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00624473-I1.
The latest status recorded for B00624473-I1 is “LOC Issued.”
DOB recorded a sign-off for B00101220-I1.
The latest status recorded for B00101220-I1 is “LOC Issued.”
DOB recorded a sign-off for B00591507-I1.
The latest status recorded for B00591507-I1 is “LOC Issued.”