DOB filing B00459417-I1
Alteration filing at 888 East 56 Street
Building record · BIN 3213827
888 East 56 Street, Brooklyn, NY 11234
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3213827
888 East 56 Street
Flatlands, Brooklyn
A consolidated public-record view · updated Mar 28, 2024
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 1-story place of worship built in 1958, on a 18,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 16 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3213827. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 3 recorded as completed, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 888 East 56 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-I1.
Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-I1.
Filing B00459417-I1 reached an approved status.
Filing B00459419-I1 reached an approved status.
DOB lists a first permit date for B00459419-I1. That is not by itself confirmation of activity on site.
Installation of new sprinkler system throughout existing cellar first floor and mezzanine all as per plan. no change to use or egress. Filing B00484474-I1.
Filing B00484474-I1 reached an approved status.
DOB lists a first permit date for B00484474-I1. That is not by itself confirmation of activity on site.
Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P1.
Filing B00459419-P1 reached an approved status.
The latest status recorded for B00459419-P1 is “Approved.”
Installation of new sprinkler system throughout existing cellar first floor and mezzanine all as per plan. no change to use or egress. Filing B00484474-P1.
Filing B00484474-P1 reached an approved status.
The latest status recorded for B00484474-P1 is “Approved.”
Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-P1.
Filing B00459417-P1 reached an approved status.
The latest status recorded for B00459417-P1 is “Approved.”
DOB lists a first permit date for B00459417-I1. That is not by itself confirmation of activity on site.
Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-P2.
Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P2.
Filing B00459417-P2 reached an approved status.
The latest status recorded for B00459417-P2 is “Approved.”
Filing B00459419-P2 reached an approved status.
The latest status recorded for B00459419-P2 is “Approved.”
DOB recorded a sign-off for B00484474-I1.
The latest status recorded for B00484474-I1 is “LOC Issued.”
Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P3.
Filing B00459419-P3 reached an approved status.
The latest status recorded for B00459419-P3 is “Approved.”
Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P4.
Filing B00459419-P4 reached an approved status.
The latest status recorded for B00459419-P4 is “Approved.”
DOB recorded a sign-off for B00459419-I1.
The latest status recorded for B00459419-I1 is “LOC Issued.”
Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-P3.
Filing B00459417-P3 reached an approved status.
The latest status recorded for B00459417-P3 is “Approved.”
DOB recorded a sign-off for B00459417-I1.
The latest status recorded for B00459417-I1 is “LOC Issued.”