Building record · BIN 3213827

888 East 56 Street

888 East 56 Street, Brooklyn, NY 11234

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3213827

888 East 56 Street

Flatlands, Brooklyn

A consolidated public-record view · updated Mar 28, 2024

DOB filings
11
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records8
First included filingFeb 17, 2021
Latest recorded changeMar 28, 2024

The lot

What is already here?

The lot holds a 1-story place of worship built in 1958, on a 18,000 sq ft lot.

Built
1958
Last altered
2013
Floors
1
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R3-2
Lot area
18,000 sq ft
Building area
16,628 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 16 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3213827. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 alteration filing. Its latest status categories are 3 recorded as completed, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 17, 2021
Latest recorded change
Mar 28, 2024
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 888 East 56 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-I1.

    01
  2. Alteration filed

    Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-I1.

    02
  3. Alteration approved

    Filing B00459417-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B00459419-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00459419-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Installation of new sprinkler system throughout existing cellar first floor and mezzanine all as per plan. no change to use or egress. Filing B00484474-I1.

    06
  7. Alteration approved

    Filing B00484474-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00484474-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P1.

    09
  10. Alteration approved

    Filing B00459419-P1 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for B00459419-P1 is “Approved.”

    011
  12. Alteration filed

    Installation of new sprinkler system throughout existing cellar first floor and mezzanine all as per plan. no change to use or egress. Filing B00484474-P1.

    012
  13. Alteration approved

    Filing B00484474-P1 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00484474-P1 is “Approved.”

    014
  15. Alteration filed

    Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-P1.

    015
  16. Alteration approved

    Filing B00459417-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00459417-P1 is “Approved.”

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for B00459417-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-P2.

    019
  20. Alteration filed

    Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P2.

    020
  21. Alteration approved

    Filing B00459417-P2 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00459417-P2 is “Approved.”

    022
  23. Alteration approved

    Filing B00459419-P2 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for B00459419-P2 is “Approved.”

    024
  25. Alteration signed off

    DOB recorded a sign-off for B00484474-I1.

    025
  26. Alteration now completed

    The latest status recorded for B00484474-I1 is “LOC Issued.”

    026
  27. Alteration filed

    Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P3.

    027
  28. Alteration approved

    Filing B00459419-P3 reached an approved status.

    028
  29. Alteration now approved

    The latest status recorded for B00459419-P3 is “Approved.”

    029
  30. Alteration filed

    Installation of new plumbing fixtures throughout existing cellar, first floor and mezzanine. installation of new underground sewer and storm drain piping. installation of new gas pipe to roof top furnish. installation of new baptistism pool. Filing B00459419-P4.

    030
  31. Alteration approved

    Filing B00459419-P4 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for B00459419-P4 is “Approved.”

    032
  33. Alteration signed off

    DOB recorded a sign-off for B00459419-I1.

    033
  34. Alteration now completed

    The latest status recorded for B00459419-I1 is “LOC Issued.”

    034
  35. Alteration filed

    Installation of new mechanical HVAC duct work in existing church; installation of four new gas furnace HVAC units; installation of three heat [pumps and one split system on fgirst floor roof. no change to use, egress or occupancy. Filing B00459417-P3.

    035
  36. Alteration approved

    Filing B00459417-P3 reached an approved status.

    036
  37. Alteration now approved

    The latest status recorded for B00459417-P3 is “Approved.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for B00459417-I1.

    038
  39. Alteration now completed

    The latest status recorded for B00459417-I1 is “LOC Issued.”

    039