Building record · BIN 3255603

2 Metrotech Center

2 Metrotech Center, Brooklyn, NY 11201

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3255603

2 Metrotech Center

Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn

A consolidated public-record view · updated Sep 8, 2026

DOB filings
20
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings20
Open or active-status records2
First included filingSep 17, 2018
Latest recorded changeSep 8, 2026

The lot

What is already here?

The lot holds a 11-story office building built in 1989, on a 53,750 sq ft lot.

Built
1989
Last altered
2012
Floors
11
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-1A
Lot area
53,750 sq ft
Building area
598,232 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3255603. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 alteration filing. Its latest status categories are 2 approved, 18 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 17, 2018
Latest recorded change
Sep 8, 2026
Highest proposed story count
12 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2 Metrotech Center.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00079288-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00079288-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Illuminated non advertising double face projecting accessory sign - big eye sushi. no change of use, egress or occupancy. Filing B00054580-I1.

    03
  4. Alteration filed

    Illuminated non advertising accessory wall sign- (sushi logo ) no change of use, egress or occupancy. Filing B00054587-I1.

    04
  5. Alteration approved

    Filing B00054580-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00054580-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration approved

    Filing B00054587-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00054587-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration signed off

    DOB recorded a sign-off for B00054580-I1.

    09
  10. Alteration signed off

    DOB recorded a sign-off for B00054587-I1.

    010
  11. Alteration signed off

    DOB recorded a sign-off for B00079288-I1.

    011
  12. Alteration filed

    Erect non-illuminated wall sign reading "organic coffee star good food". Filing B00145372-I1.

    012
  13. Alteration filed

    Erect non-illuminated wall sign reading "star pret star". Filing B00145384-I1.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00145384-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Erect non-illuminated double faced blade sign reading "star pret star". Filing B00145388-I1.

    015
  16. Alteration filed

    Erect illuminated window sign reading "star pret". Filing B00145394-I1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for B00145394-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    Erect non-illuminated wall sign reading "star pret star". Filing B00145400-I1.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for B00145400-I1. That is not by itself confirmation of activity on site.

    019
  20. Alteration filed

    Erect non-illuminated wall sign reading "organic coffee star good food". Filing B00145406-I1.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00145406-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Erect illuminated window sign reading "star pret". Filing B00145410-I1.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for B00145410-I1. That is not by itself confirmation of activity on site.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00145372-I1. That is not by itself confirmation of activity on site.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for B00145388-I1. That is not by itself confirmation of activity on site.

    025
  26. Alteration signed off

    DOB recorded a sign-off for B00145372-I1.

    026
  27. Alteration signed off

    DOB recorded a sign-off for B00145384-I1.

    027
  28. Alteration signed off

    DOB recorded a sign-off for B00145388-I1.

    028
  29. Alteration signed off

    DOB recorded a sign-off for B00145394-I1.

    029
  30. Alteration signed off

    DOB recorded a sign-off for B00145400-I1.

    030
  31. Alteration signed off

    DOB recorded a sign-off for B00145406-I1.

    031
  32. Alteration signed off

    DOB recorded a sign-off for B00145410-I1.

    032
  33. Alteration filed

    Modification of plumbing fixtures and install 2 new sprinkler heads on 5th floor(Bathrooms) as per plans filed herewith. No change in use, egress or occupancy. Filing B00234722-I1.

    033
  34. Alteration approved

    Filing B00234722-I1 reached an approved status.

    034
  35. Alteration filed

    Removal of existing structural slab, corroded deck &fireproofing. replace slab between existing framing. no change in use, egress or occupancy. Filing B00251224-I1.

    035
  36. Alteration approved

    Filing B00251224-I1 reached an approved status.

    036
  37. Alteration filed

    Modify ductwork and diffusers as required from new OT work on 10th floor (NYU-Tandon School) as per plans filed herewith. No change in use, egress or occupancy. Filing B00265012-I1.

    037
  38. Alteration approved

    Filing B00265012-I1 reached an approved status.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for B00265012-I1. That is not by itself confirmation of activity on site.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for B00234722-I1. That is not by itself confirmation of activity on site.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for B00251224-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration filed

    Modification of existing mechanical system on partial 8th floor (NYU Teaching & Learning Center) as per plans. No change in use, egress or occupanc. Filing B00266828-I1.

    042
  43. Alteration filed

    Modification of sprinklers on partial 8th floor (NYU Teaching & Learning Center) as per plans filed herewith. No change in use, egress or occupancy. Filing B00266859-I1.

    043
  44. Alteration approved

    Filing B00266828-I1 reached an approved status.

    044
  45. Alteration approved

    Filing B00266859-I1 reached an approved status.

    045
  46. Alteration filed

    Modification of plumbing fixtures and install 2 new sprinkler heads on 5th floor(Bathrooms) as per plans filed herewith. No change in use, egress or occupancy. Filing B00234722-P1.

    046
  47. Alteration approved

    Filing B00234722-P1 reached an approved status.

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for B00266859-I1. That is not by itself confirmation of activity on site.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for B00266828-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration now approved

    The latest status recorded for B00234722-P1 is “Approved.”

    050
  51. Alteration now completed

    The latest status recorded for B00054580-I1 is “LOC Issued.”

    051
  52. Alteration now completed

    The latest status recorded for B00054587-I1 is “LOC Issued.”

    052
  53. Alteration now completed

    The latest status recorded for B00079288-I1 is “LOC Issued.”

    053
  54. Alteration now completed

    The latest status recorded for B00145372-I1 is “LOC Issued.”

    054
  55. Alteration now completed

    The latest status recorded for B00145384-I1 is “LOC Issued.”

    055
  56. Alteration now completed

    The latest status recorded for B00145388-I1 is “LOC Issued.”

    056
  57. Alteration now completed

    The latest status recorded for B00145394-I1 is “LOC Issued.”

    057
  58. Alteration now completed

    The latest status recorded for B00145400-I1 is “LOC Issued.”

    058
  59. Alteration now completed

    The latest status recorded for B00145406-I1 is “LOC Issued.”

    059
  60. Alteration now completed

    The latest status recorded for B00145410-I1 is “LOC Issued.”

    060
  61. Alteration signed off

    DOB recorded a sign-off for B00266859-I1.

    061
  62. Alteration now completed

    The latest status recorded for B00266859-I1 is “LOC Issued.”

    062
  63. Alteration signed off

    DOB recorded a sign-off for B00265012-I1.

    063
  64. Alteration now completed

    The latest status recorded for B00265012-I1 is “LOC Issued.”

    064
  65. Alteration signed off

    DOB recorded a sign-off for B00266828-I1.

    065
  66. Alteration now completed

    The latest status recorded for B00266828-I1 is “LOC Issued.”

    066
  67. Alteration signed off

    DOB recorded a sign-off for B00234722-I1.

    067
  68. Alteration now completed

    The latest status recorded for B00234722-I1 is “LOC Issued.”

    068
  69. Alteration filed

    Installation of (3) new plumbing fixtures in single user toilet room and adjacent water fountain. New piping for hard piped pantry water filter. All work filed under this application is interior work only. Filing B00335095-I1.

    069
  70. Alteration filed

    Modification of ductwork and diffusers as required from new partition work on 9th & 10th floor (NYU) . All work filed under this application will be interior work only. Filing B00335145-I1.

    070
  71. Alteration filed

    Installation and relocation of sprinkler heads on 9th &10th floor (NYU Phase 2). All work filed under this application is for interior work only. Filing B00335170-I1.

    071
  72. Alteration approved

    Filing B00335095-I1 reached an approved status.

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for B00335095-I1. That is not by itself confirmation of activity on site.

    073
  74. Alteration approved

    Filing B00335145-I1 reached an approved status.

    074
  75. Alteration approved

    Filing B00335170-I1 reached an approved status.

    075
  76. Permit recorded for alteration

    DOB lists a first permit date for B00335170-I1. That is not by itself confirmation of activity on site.

    076
  77. Permit recorded for alteration

    DOB lists a first permit date for B00335145-I1. That is not by itself confirmation of activity on site.

    077
  78. Alteration signed off

    DOB recorded a sign-off for B00335095-I1.

    078
  79. Alteration now completed

    The latest status recorded for B00335095-I1 is “LOC Issued.”

    079
  80. Alteration signed off

    DOB recorded a sign-off for B00335145-I1.

    080
  81. Alteration now completed

    The latest status recorded for B00335145-I1 is “LOC Issued.”

    081
  82. Alteration signed off

    DOB recorded a sign-off for B00335170-I1.

    082
  83. Alteration now completed

    The latest status recorded for B00335170-I1 is “LOC Issued.”

    083
  84. Alteration signed off

    DOB recorded a sign-off for B00251224-I1.

    084
  85. Alteration now completed

    The latest status recorded for B00251224-I1 is “LOC Issued.”

    085
  86. Alteration filed

    Plumbing removal of based building piping and water piping connected to cooling towers. Filing B01436121-S2.

    086
  87. Alteration approved

    Filing B01436121-S2 reached an approved status.

    087
  88. Alteration now approved

    The latest status recorded for B01436121-S2 is “Approved.”

    088