DOB filing B00325449-I1
Alteration filing at 38 Fleet Walk
Building record · BIN 3257037
38 Fleet Walk, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3257037
38 Fleet Walk
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Jan 9, 2024
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story elevator apartment building built in 1939, with 542 homes, on a 459,742 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing.
Violation record
No open violations are recorded for this building. 6 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3257037. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 9 alteration filing. Its latest status categories are 7 recorded as completed, 1 closed or withdrawn, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 38 Fleet Walk.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of new sidewalk shed at 38 fleet walk, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00325449-I1.
Installation of temporary construction fence at 38 fleet walk, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00325467-I1.
DOB lists a first permit date for B00325449-I1. That is not by itself confirmation of activity on site.
Installation of temporary chain link fence as per plans. temporary chain link fence shall comply with chapter # 33 of the NYC building code. no change in use, egress or occupancy. Filing B00328868-I1.
Installation of temporary construction fence at 38 fleet walk, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00330235-I1.
DOB lists a first permit date for B00330235-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00328868-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. temporary sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, egress or occupancy. Filing B00332734-I1.
DOB lists a first permit date for B00332734-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold at 38 fleet walk, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00352341-I1.
Installation of pipe scaffold with material hoist at 38 fleet walk, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00352342-I1.
DOB lists a first permit date for B00352341-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00352342-I1. That is not by itself confirmation of activity on site.
Installation of pipe scaffold at 38 fleet walk, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00352341-P1.
Filing B00352341-P1 reached an approved status.
DOB recorded a sign-off for B00328868-I1.
DOB recorded a sign-off for B00332734-I1.
The latest status recorded for B00325467-I1 is “QA Failed.”
The latest status recorded for B00328868-I1 is “LOC Issued.”
The latest status recorded for B00332734-I1 is “LOC Issued.”
The latest status recorded for B00352341-P1 is “Approved.”
Installation of debris chute at 38 fleet walk, brooklyn as per indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00511191-I1.
Filing B00511191-I1 reached an approved status.
DOB lists a first permit date for B00511191-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00352341-I1.
DOB recorded a sign-off for B00511191-I1.
The latest status recorded for B00352341-I1 is “LOC Issued.”
DOB recorded a sign-off for B00352342-I1.
The latest status recorded for B00352342-I1 is “LOC Issued.”
The latest status recorded for B00511191-I1 is “LOC Issued.”
DOB recorded a sign-off for B00330235-I1.
The latest status recorded for B00330235-I1 is “LOC Issued.”
DOB recorded a sign-off for B00325449-I1.
The latest status recorded for B00325449-I1 is “LOC Issued.”