Building record · BIN 3321875

345 Clinton Avenue

345 Clinton Avenue, Brooklyn, NY 11238

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3321875

345 Clinton Avenue

Clinton Hill, Brooklyn

A consolidated public-record view · updated Sep 2, 2026

DOB filings
10
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records5
First included filingOct 31, 2018
Latest recorded changeSep 2, 2026

The lot

What is already here?

The lot holds a 14-story elevator apartment building built in 1945, with 424 homes, on a 84,600 sq ft lot.

Built
1945
Floors
14
Residential units
424
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
84,600 sq ft
Building area
448,000 sq ft
Historic district
Clinton Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 47 notices on file; the most recent was issued Jun 20, 2023.

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • 7 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3321875. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 5 recorded as completed, 1 under review, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 31, 2018
Latest recorded change
Sep 2, 2026
Highest proposed story count
14 stories
Highest proposed unit count
111 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 345 Clinton Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of VERIZON telecommunications site. Installing (6) antennas, (6) related small cell units, (1) equipment cabinet, and (2) GPS units on the roof. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy. Filing B00000605-I1.

    01
  2. Alteration approved

    Filing B00000605-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00000605-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00146688-I1.

    04
  5. Alteration approved

    Filing B00146688-I1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00146688-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration signed off

    DOB recorded a sign-off for B00000605-I1.

    07
  8. Alteration filed

    Installation of starry telecommunications site. installing 3 sectors (1 antenna per sector, total of 3 antennas) and (1) distribution cabinet on the roof with related conduit. all in conformance with tppn 5/98. no change in use, egress or occupancy. Filing B00062903-I1.

    08
  9. Alteration approved

    Filing B00062903-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00062903-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Installation of plumbing fixtures as per plans filed herewith. Filing B00323804-I1.

    011
  12. Alteration approved

    Filing B00323804-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00323804-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration now completed

    The latest status recorded for B00000605-I1 is “LOC Issued.”

    014
  15. Alteration now approved

    The latest status recorded for B00146688-I1 is “Permit Entire.”

    015
  16. Alteration filed

    Installation of plumbing fixtures as per plans filed herewith. Filing B00323804-P1.

    016
  17. Alteration approved

    Filing B00323804-P1 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00323804-P1 is “Approved.”

    018
  19. Alteration filed

    Renovation of bathroom, interior demolition, new partition, re-finish floors, painting & lighting. plumbing work filed under separate application. no change is use, occupancy or means of egress. Filing B00501074-I1.

    019
  20. Alteration filed

    Plumbing work in existing apartment as shown on plans. no change in use, occupancy or means of egress. Filing B00501037-I1.

    020
  21. Alteration approved

    Filing B00501037-I1 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for B00062903-I1 is “Permit Entire.”

    022
  23. Alteration approved

    Filing B00501074-I1 reached an approved status.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00501074-I1. That is not by itself confirmation of activity on site.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for B00501037-I1. That is not by itself confirmation of activity on site.

    025
  26. Alteration signed off

    DOB recorded a sign-off for B00323804-I1.

    026
  27. Alteration now completed

    The latest status recorded for B00323804-I1 is “LOC Issued.”

    027
  28. Alteration filed

    Plumbing work in existing apartment as shown on plans. no change in use, occupancy or means of egress. Filing B00501037-P1.

    028
  29. Alteration approved

    Filing B00501037-P1 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B00501037-P1 is “Approved.”

    030
  31. Alteration signed off

    DOB recorded a sign-off for B00501037-I1.

    031
  32. Alteration now completed

    The latest status recorded for B00501037-I1 is “LOC Issued.”

    032
  33. Alteration signed off

    DOB recorded a sign-off for B00501074-I1.

    033
  34. Alteration now completed

    The latest status recorded for B00501074-I1 is “LOC Issued.”

    034
  35. Alteration filed

    Installation of starry telecom site on roof. (3) new sectors (6 panel antennas & 3 microwave dish antennas). install (2) equipment cabinets with related conduit routage and servicing. no change in use, egress, or occupancy. Filing B00062903-P1.

    035
  36. Alteration now under review

    The latest status recorded for B00062903-P1 is “Objections.”

    036
  37. Alteration filed

    Interior renovation of apartment 12g. new partitions and finishes per plans. Filing B01334235-I1.

    037
  38. Alteration approved

    Filing B01334235-I1 reached an approved status.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for B01334235-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration signed off

    DOB recorded a sign-off for B01334235-I1.

    040
  41. Alteration now completed

    The latest status recorded for B01334235-I1 is “LOC Issued.”

    041