DOB filing B01334235-I1
Alteration filing at 345 Clinton Avenue
Building record · BIN 3321875
345 Clinton Avenue, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3321875
345 Clinton Avenue
Clinton Hill, Brooklyn
A consolidated public-record view · updated Sep 2, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14-story elevator apartment building built in 1945, with 424 homes, on a 84,600 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 10 open notices on record for this building, out of 47 notices on file; the most recent was issued Jun 20, 2023.
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
7 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3321875. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 5 recorded as completed, 1 under review, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 345 Clinton Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of VERIZON telecommunications site. Installing (6) antennas, (6) related small cell units, (1) equipment cabinet, and (2) GPS units on the roof. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy. Filing B00000605-I1.
Filing B00000605-I1 reached an approved status.
DOB lists a first permit date for B00000605-I1. That is not by itself confirmation of activity on site.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300psf. Filing B00146688-I1.
Filing B00146688-I1 reached an approved status.
DOB lists a first permit date for B00146688-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00000605-I1.
Installation of starry telecommunications site. installing 3 sectors (1 antenna per sector, total of 3 antennas) and (1) distribution cabinet on the roof with related conduit. all in conformance with tppn 5/98. no change in use, egress or occupancy. Filing B00062903-I1.
Filing B00062903-I1 reached an approved status.
DOB lists a first permit date for B00062903-I1. That is not by itself confirmation of activity on site.
Installation of plumbing fixtures as per plans filed herewith. Filing B00323804-I1.
Filing B00323804-I1 reached an approved status.
DOB lists a first permit date for B00323804-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00000605-I1 is “LOC Issued.”
The latest status recorded for B00146688-I1 is “Permit Entire.”
Installation of plumbing fixtures as per plans filed herewith. Filing B00323804-P1.
Filing B00323804-P1 reached an approved status.
The latest status recorded for B00323804-P1 is “Approved.”
Renovation of bathroom, interior demolition, new partition, re-finish floors, painting & lighting. plumbing work filed under separate application. no change is use, occupancy or means of egress. Filing B00501074-I1.
Plumbing work in existing apartment as shown on plans. no change in use, occupancy or means of egress. Filing B00501037-I1.
Filing B00501037-I1 reached an approved status.
The latest status recorded for B00062903-I1 is “Permit Entire.”
Filing B00501074-I1 reached an approved status.
DOB lists a first permit date for B00501074-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00501037-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00323804-I1.
The latest status recorded for B00323804-I1 is “LOC Issued.”
Plumbing work in existing apartment as shown on plans. no change in use, occupancy or means of egress. Filing B00501037-P1.
Filing B00501037-P1 reached an approved status.
The latest status recorded for B00501037-P1 is “Approved.”
DOB recorded a sign-off for B00501037-I1.
The latest status recorded for B00501037-I1 is “LOC Issued.”
DOB recorded a sign-off for B00501074-I1.
The latest status recorded for B00501074-I1 is “LOC Issued.”
Installation of starry telecom site on roof. (3) new sectors (6 panel antennas & 3 microwave dish antennas). install (2) equipment cabinets with related conduit routage and servicing. no change in use, egress, or occupancy. Filing B00062903-P1.
The latest status recorded for B00062903-P1 is “Objections.”
Interior renovation of apartment 12g. new partitions and finishes per plans. Filing B01334235-I1.
Filing B01334235-I1 reached an approved status.
DOB lists a first permit date for B01334235-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B01334235-I1.
The latest status recorded for B01334235-I1 is “LOC Issued.”