DOB filing B01200760-I1
Alteration filing at 475 Carlton Avenue
Building record · BIN 3321981
475 Carlton Avenue, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3321981
475 Carlton Avenue
Fort Greene, Brooklyn
A consolidated public-record view · updated Sep 4, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 15-story elevator apartment building built in 1974, with 304 homes, on a 125,150 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 13 open notices on record for this building, out of 52 notices on file; the most recent was issued Feb 22, 2023.
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
10 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3321981. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 475 Carlton Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc. Filing B01200760-I1.
DOB lists a first permit date for B01200760-I1. That is not by itself confirmation of activity on site.
Modification to existing T-Mobile site. Temporary relocation of 4 equipment cabinets, 9 RRUs and 3 sectors (12 antennas). Filing B01375662-I1.
Filing B01375662-I1 reached an approved status.
DOB lists a first permit date for B01375662-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01375662-I1 is “Permit Entire.”
The latest status recorded for B01200760-I1 is “Permit Entire.”