DOB filing B00478672-S1
Alteration filing at 155 Wortman Avenue
Building record · BIN 3324014
155 Wortman Avenue, Brooklyn, NY 11207
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3324014
155 Wortman Avenue
East New York-New Lots, Brooklyn
A consolidated public-record view · updated May 6, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 16-story elevator apartment building built in 1966, with 336 homes, on a 219,314 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 14 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3324014. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 21 alteration filing. Its latest status categories are 8 recorded as completed, 13 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 155 Wortman Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Applying for sidewalk shed permit on behalf of the building owner. Filing B00185278-I1.
DOB lists a first permit date for B00185278-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence as per plans. no change in use, egress or occupancy. Filing B00262231-I1.
DOB lists a first permit date for B00262231-I1. That is not by itself confirmation of activity on site.
Interior renovation of 8-story nycha multiple dwelling: remove and dispose of non-bearing partitions; remove and replace finishes, fixtures, and doors as per plans; no changes to use, egress, or occupancy. Filing B00478672-I1.
Replacement of existing kitchen and bathroom fxitures on existing rough-in and as required for accessibility upgrades in conjunction with work filed under separate architectural (ot) application. replacement of gas stoves on existing roughing. Filing B00478672-S1.
Filing B00478672-I1 reached an approved status.
Filing B00478672-S1 reached an approved status.
Mechanical work in conjunction with renovation of 8-story nycha multiple dwelling throughout. no change to use, egress or occupancy. Filing B00478672-S3.
Plumbing work in conjunction with renovation of 8-story nycha multiple dwelling in public areas. no change to use, egress or occupancy. Filing B00478672-S2.
Filing B00478672-S2 reached an approved status.
Filing B00478672-S3 reached an approved status.
DOB lists a first permit date for B00478672-I1. That is not by itself confirmation of activity on site.
Limited exterior repairs and roof replacement. No change to use, egress or occupancy. Filing B00478672-S4.
Filing B00478672-S4 reached an approved status.
DOB recorded a sign-off for B00185278-I1.
The latest status recorded for B00185278-I1 is “LOC Issued.”
DOB recorded a sign-off for B00262231-I1.
The latest status recorded for B00262231-I1 is “LOC Issued.”
Replacement of existing kitchen and bathroom fxitures on existing rough-in and as required for accessibility upgrades in conjunction with work filed under separate architectural (ot) application. Filing B00478672-P1.
Filing B00478672-P1 reached an approved status.
DOB lists a first permit date for B00478672-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00478672-S1. That is not by itself confirmation of activity on site.
Interior renovation of 8-story nycha multiple dwelling: remove and dispose of non-bearing partitions; remove and replace finishes, fixtures, and doors as per plans; no changes to use, egress, or occupancy. Filing B00478672-P2.
DOB lists a first permit date for B00478672-S3. That is not by itself confirmation of activity on site.
Plumbing work in conjunction with renovation of 8-story nycha multiple dwelling in public areas. no change to use, egress or occupancy. Filing B00478672-P3.
Mechanical work in conjunction with renovation of 8-story nycha multiple dwelling throughout. no change to use, egress or occupancy. Filing B00478672-P4.
Filing B00478672-P3 reached an approved status.
Filing B00478672-P4 reached an approved status.
Structural work include: Proposed roof dunnage for rooftop mechanical equipment; New footing and slab on ground for exhaust penetration through the ground floor; No change in use, egress or occupancy. Filing B00478672-S5.
Filing B00478672-S5 reached an approved status.
Structural work include: Proposed roof dunnage for rooftop mechanical equipment; New footing and slab on ground for exhaust penetration through the ground floor; No change in use, egress or occupancy. Filing B00478672-P5.
Filing B00478672-P5 reached an approved status.
DOB lists a first permit date for B00478672-S5. That is not by itself confirmation of activity on site.
Plumbing work in conjunction with renovation of 8-story nycha multiple dwelling in public areas. no change to use, egress or occupancy. Filing B00478672-P6.
Filing B00478672-P6 reached an approved status.
DOB lists a first permit date for B00478672-S2. That is not by itself confirmation of activity on site.
The latest status recorded for B00478672-P1 is “Approved.”
Filing B00478672-P2 reached an approved status.
The latest status recorded for B00478672-P2 is “Approved.”
The latest status recorded for B00478672-P3 is “Approved.”
The latest status recorded for B00478672-P4 is “Approved.”
The latest status recorded for B00478672-P5 is “Approved.”
The latest status recorded for B00478672-P6 is “Approved.”
DOB recorded a sign-off for B00478672-S4.
The latest status recorded for B00478672-S4 is “LOC Issued.”
DOB recorded a sign-off for B00478672-S5.
The latest status recorded for B00478672-S5 is “LOC Issued.”
Replacement of existing kitchen and bathroom fxitures on existing rough-in and as required for accessibility upgrades in conjunction with work filed under separate architectural (ot) application. Filing B00478672-P7.
Plumbing work in conjunction with renovation of 8-story nycha multiple dwelling in public areas. no change to use, egress or occupancy. Filing B00478672-P8.
Filing B00478672-P8 reached an approved status.
The latest status recorded for B00478672-P8 is “Approved.”
Mechanical work in conjunction with renovation of 8-story nycha multiple dwelling throughout. no change to use, egress or occupancy. Filing B00478672-P9.
Filing B00478672-P7 reached an approved status.
The latest status recorded for B00478672-P7 is “Approved.”
Filing B00478672-P9 reached an approved status.
The latest status recorded for B00478672-P9 is “Approved.”
Replacement of existing kitchen and bathroom fxitures on existing rough-in and as required for accessibility upgrades in conjunction with work filed under separate architectural (ot) application. replacement of gas stoves on existing roughing. Filing B00478672-A1.
Mechanical work in conjunction with renovation of 8-story nycha multiple dwelling throughout. no change to use, egress or occupancy. Filing B00478672-A2.
Filing B00478672-A1 reached an approved status.
The latest status recorded for B00478672-A1 is “Approved.”
Filing B00478672-A2 reached an approved status.
The latest status recorded for B00478672-A2 is “Approved.”
DOB recorded a sign-off for B00478672-S2.
The latest status recorded for B00478672-S2 is “LOC Issued.”
DOB recorded a sign-off for B00478672-S3.
The latest status recorded for B00478672-S3 is “LOC Issued.”
Interior renovation of 8-story nycha multiple dwelling: remove and dispose of non-bearing partitions; remove and replace finishes, fixtures, and doors as per plans; no changes to use, egress, or occupancy. Filing B00478672-A5.
Filing B00478672-A5 reached an approved status.
The latest status recorded for B00478672-A5 is “Approved.”
Replacement of existing kitchen and bathroom fxitures on existing rough-in and as required for accessibility upgrades in conjunction with work filed under separate architectural (ot) application. replacement of gas stoves on existing roughing. Filing B00478672-A4.
Filing B00478672-A4 reached an approved status.
The latest status recorded for B00478672-A4 is “Approved.”
DOB recorded a sign-off for B00478672-I1.
The latest status recorded for B00478672-I1 is “LOC Issued.”
DOB recorded a sign-off for B00478672-S1.
The latest status recorded for B00478672-S1 is “LOC Issued.”