Building record · BIN 3324728

33 Marcus Garvey Boulevard

33 Marcus Garvey Boulevard, Brooklyn, NY 11206

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 19 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3324728

33 Marcus Garvey Boulevard

Bedford-Stuyvesant (East), Brooklyn

A consolidated public-record view · updated Sep 28, 2026

DOB filings
19
Active-status
11
Recorded addresses
3
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings19
Open or active-status records11
First included filingMay 6, 2019
Latest recorded changeSep 28, 2026

The lot

What is already here?

The lot holds a 7-story elevator apartment building built in 1951, with 1099 homes, on a 504,500 sq ft lot.

  1. Floors 2–7Homes1,099 homes are recorded on this lot — about 183 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes1,099 recorded on the lot
  • Above the southern skylineFrom about floor 11 — the tallest thing within 60 m to the south is 30.5 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 20.3 m over 7 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1951
Last altered
2012
Floors
7
Residential units
1099
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
504,500 sq ft
Building area
924,915 sq ft

Housing violations

8 violations are open against this address under the Housing Maintenance Code.

  • 0Immediately hazardous
  • 8Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 20 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • Local law 11/98 - facade

    Issued Jul 8, 2013 — CYCLE 7 UNSAFE REPORT FILED

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3324728. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 19 alteration filing. Its latest status categories are 1 under review, 8 recorded as completed, 10 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 6, 2019
Latest recorded change
Sep 28, 2026
Highest proposed story count
16 stories
Highest proposed unit count
202 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 33 Marcus Garvey Boulevard.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Applying for temporary sidewalk shed permit on behalf of building owner. Filing B00162818-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00162818-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of new sidewalk shed at 868 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266473-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00266473-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of temporary construction fence at 868 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266488-I1.

    05
  6. Alteration filed

    Installation of pipe scaffold at 868 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266497-I1.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00266488-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00266497-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Relocate utility lines as per plans filed herewith. Filing B00414697-I1.

    09
  10. Alteration approved

    Filing B00414697-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00414697-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    Facade restoration work as per indicated on plan. there will be no change in the use, egress or occupancy under this application. Filing B00509990-I1.

    012
  13. Alteration approved

    Filing B00509990-I1 reached an approved status.

    013
  14. Alteration filed

    Facade restoration work as per indicated on plan. there will be no change in the use, egress or occupancy under this application. Filing B00509990-P1.

    014
  15. Alteration approved

    Filing B00509990-P1 reached an approved status.

    015
  16. Alteration now approved

    The latest status recorded for B00509990-P1 is “Approved.”

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for B00509990-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    Relocate utility lines as per plans filed herewith. Filing B00414697-P1.

    018
  19. Alteration approved

    Filing B00414697-P1 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for B00414697-P1 is “Approved.”

    020
  21. Alteration signed off

    DOB recorded a sign-off for B00414697-I1.

    021
  22. Alteration now completed

    The latest status recorded for B00414697-I1 is “LOC Issued.”

    022
  23. Alteration filed

    NYCHA Sumner BOILER- BLDG # 1- Architectural work being filed for repair to existing Mechanical room. Filing B00595847-I1.

    023
  24. Alteration now completed

    The latest status recorded for B00162818-I1 is “LOC Issued.”

    024
  25. Alteration filed

    NYCHA Sumner BOILER Bldg #1- PLUMBING work related to the replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00595847-S1.

    025
  26. Alteration filed

    NYCHA-Sumner Bldg #1 Structural Work filed to provide steel reinforcing for new louver opening on non-load bearing masonry wall or foundation wall. Provide interior concrete pad for MEP equipment. Provide outdoor flue and cladding frame support. Filing B00595847-S3.

    026
  27. Alteration filed

    Civil work -nycha sumner houses building # 1. Filing B00595847-S4.

    027
  28. Alteration filed

    NYCHA-Sumner Bldg #1 Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing DHWH. Install of temp. condensate pump, fresh air intake and exhaust flue for DHWH. Filing B00595847-S2.

    028
  29. Alteration approved

    Filing B00595847-S1 reached an approved status.

    029
  30. Alteration approved

    Filing B00595847-S2 reached an approved status.

    030
  31. Alteration signed off

    DOB recorded a sign-off for B00266473-I1.

    031
  32. Alteration now completed

    The latest status recorded for B00266473-I1 is “LOC Issued.”

    032
  33. Alteration signed off

    DOB recorded a sign-off for B00266488-I1.

    033
  34. Alteration now completed

    The latest status recorded for B00266488-I1 is “LOC Issued.”

    034
  35. Alteration signed off

    DOB recorded a sign-off for B00266497-I1.

    035
  36. Alteration now completed

    The latest status recorded for B00266497-I1 is “LOC Issued.”

    036
  37. Alteration signed off

    DOB recorded a sign-off for B00509990-I1.

    037
  38. Alteration now completed

    The latest status recorded for B00509990-I1 is “LOC Issued.”

    038
  39. Alteration approved

    Filing B00595847-S3 reached an approved status.

    039
  40. Alteration approved

    Filing B00595847-S4 reached an approved status.

    040
  41. Alteration approved

    Filing B00595847-I1 reached an approved status.

    041
  42. Alteration filed

    CIVIL- GC for NYCHA Sumner Houses - On-site green infrastructure practice which involves construction of SUMN-01SRa, SUMN-02SRa, and SUMN-07SRa: proposed subsurface retention and slow-release/detention in parking lot for collection of rain water. Filing B00651619-I1.

    042
  43. Alteration approved

    Filing B00651619-I1 reached an approved status.

    043
  44. Alteration filed

    CIVIL- PL for NYCHA Sumner Houses - On-site green infrastructure practice which involves construction of SUMN-01SRa, SUMN-02SRa, and SUMN-07SRa: proposed subsurface retention and slow-release/detention in parking lot for collection of rain water. Filing B00651619-S1.

    044
  45. Alteration approved

    Filing B00651619-S1 reached an approved status.

    045
  46. Alteration signed off

    DOB recorded a sign-off for B00162818-I1.

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for B00595847-I1. That is not by itself confirmation of activity on site.

    047
  48. Alteration filed

    Civil work -nycha sumner houses building # 1. Filing B00595847-P5.

    048
  49. Alteration approved

    Filing B00595847-P5 reached an approved status.

    049
  50. Alteration now approved

    The latest status recorded for B00595847-P5 is “Approved.”

    050
  51. Permit recorded for alteration

    DOB lists a first permit date for B00595847-S2. That is not by itself confirmation of activity on site.

    051
  52. Permit recorded for alteration

    DOB lists a first permit date for B00595847-S1. That is not by itself confirmation of activity on site.

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for B00595847-S4. That is not by itself confirmation of activity on site.

    053
  54. Permit recorded for alteration

    DOB lists a first permit date for B00595847-S3. That is not by itself confirmation of activity on site.

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for B00651619-I1. That is not by itself confirmation of activity on site.

    055
  56. Permit recorded for alteration

    DOB lists a first permit date for B00651619-S1. That is not by itself confirmation of activity on site.

    056
  57. Alteration filed

    NYCHA Sumner BOILER Bldg #1- PLUMBING work related to the replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00595847-P6.

    057
  58. Alteration approved

    Filing B00595847-P6 reached an approved status.

    058
  59. Alteration now approved

    The latest status recorded for B00595847-P6 is “Approved.”

    059
  60. Alteration filed

    NYCHA Sumner BOILER Bldg #1- PLUMBING work related to the replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00595847-P7.

    060
  61. Alteration approved

    Filing B00595847-P7 reached an approved status.

    061
  62. Alteration now approved

    The latest status recorded for B00595847-P7 is “Approved.”

    062
  63. Alteration now approved

    The latest status recorded for B00595847-I1 is “Permit Entire.”

    063
  64. Alteration now approved

    The latest status recorded for B00595847-S3 is “Permit Entire.”

    064
  65. Alteration now approved

    The latest status recorded for B00595847-S4 is “Permit Entire.”

    065
  66. Alteration now approved

    The latest status recorded for B00595847-S2 is “Permit Entire.”

    066
  67. Alteration now approved

    The latest status recorded for B00595847-S1 is “Permit Entire.”

    067
  68. Alteration signed off

    DOB recorded a sign-off for B00651619-S1.

    068
  69. Alteration now completed

    The latest status recorded for B00651619-S1 is “LOC Issued.”

    069
  70. Alteration signed off

    DOB recorded a sign-off for B00651619-I1.

    070
  71. Alteration now completed

    The latest status recorded for B00651619-I1 is “LOC Issued.”

    071
  72. Alteration filed

    NYCHA Sumner BOILER Bldg #1- PLUMBING work related to the replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00595847-P8.

    072
  73. Alteration now under review

    The latest status recorded for B00595847-P8 is “Plan Examiner Review.”

    073