Building record · BIN 3324968

153 Marcus Garvey Boulevard

153 Marcus Garvey Boulevard, Brooklyn, NY 11206

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3324968

153 Marcus Garvey Boulevard

Bedford-Stuyvesant (East), Brooklyn

A consolidated public-record view · updated Sep 17, 2026

DOB filings
10
Active-status
9
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records9
First included filingApr 16, 2021
Latest recorded changeSep 17, 2026

The lot

What is already here?

The lot holds a 15-story elevator apartment building built in 1962, with 270 homes, on a 150,000 sq ft lot.

  1. Floors 6–15Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 16.6 m. Nothing on that side reaches this floor.
  2. Floors 2–5Homes270 homes are recorded on this lot — about 19 homes to a floor. The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes270 recorded on the lot
  • Above the southern skylineFrom about floor 6 — the tallest thing within 60 m to the south is 16.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 41.3 m over 15 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1962
Floors
15
Residential units
270
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
150,000 sq ft
Building area
922,336 sq ft

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 21 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3324968. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 1 recorded as completed, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 16, 2021
Latest recorded change
Sep 17, 2026
Highest proposed story count
15 stories
Highest proposed unit count
270 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 153 Marcus Garvey Boulevard.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Interior renovation work to the tank room. Filing B00455013-I1.

    01
  2. Alteration approved

    Filing B00455013-I1 reached an approved status.

    02
  3. Alteration filed

    Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439388-I1.

    03
  4. Alteration filed

    Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room. Filing B00435208-I1.

    04
  5. Alteration approved

    Filing B00439388-I1 reached an approved status.

    05
  6. Alteration approved

    Filing B00435208-I1 reached an approved status.

    06
  7. Alteration filed

    Nycha boiler - structural work for interior renovation replacing concrete pads. Filing B00432674-I1.

    07
  8. Alteration approved

    Filing B00432674-I1 reached an approved status.

    08
  9. Alteration filed

    Nycha boiler - structural work for interior renovation replacing concrete pads. Filing B00432674-P1.

    09
  10. Alteration approved

    Filing B00432674-P1 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for B00432674-P1 is “Approved.”

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00432674-I1. That is not by itself confirmation of activity on site.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B00435208-I1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00455013-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for B00439388-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Suspended scaffold installation and use and bucket hoist as per plans filed herewith. Filing B00432674-S1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for B00432674-S1. That is not by itself confirmation of activity on site.

    017
  18. Alteration now approved

    The latest status recorded for B00432674-S1 is “Permit Entire.”

    018
  19. Alteration filed

    Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439388-P1.

    019
  20. Alteration approved

    Filing B00439388-P1 reached an approved status.

    020
  21. Alteration now approved

    The latest status recorded for B00439388-P1 is “Approved.”

    021
  22. Alteration filed

    Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439388-P2.

    022
  23. Alteration filed

    Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room. Filing B00435208-P1.

    023
  24. Alteration approved

    Filing B00439388-P2 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for B00439388-P2 is “Approved.”

    025
  26. Alteration approved

    Filing B00435208-P1 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for B00435208-P1 is “Approved.”

    027
  28. Alteration filed

    Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439388-P3.

    028
  29. Alteration approved

    Filing B00439388-P3 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B00439388-P3 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for B00455013-I1 is “Permit Entire.”

    031
  32. Alteration now approved

    The latest status recorded for B00435208-I1 is “Permit Entire.”

    032
  33. Alteration now approved

    The latest status recorded for B00432674-I1 is “Permit Entire.”

    033
  34. Alteration signed off

    DOB recorded a sign-off for B00439388-I1.

    034
  35. Alteration now completed

    The latest status recorded for B00439388-I1 is “LOC Issued.”

    035