DOB filing B00455044-I1
Alteration filing at 927 Dekalb Avenue
Building record · BIN 3324969
927 Dekalb Avenue, Brooklyn, NY 11221
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3324969
927 Dekalb Avenue
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Sep 16, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 15-story elevator apartment building built in 1962, with 270 homes, on a 150,000 sq ft lot.
Owner of record
NYC HOUSING AUTHORITY
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 17 notices on file; the most recent was issued Oct 24, 2023.
Issued Oct 24, 2023 — NYCHA CYCLE 9B UNSAFE REPORT FILED
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Issued Sep 20, 2004
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3324969. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 11 alteration filing. Its latest status categories are 3 recorded as completed, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 927 Dekalb Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work associated with installation of storm water retention practices per dep on-site public property green infrastructure retrofit contract as approved under alt 2 job no. 322016224. no change to use, egress or occupancy. Filing B00318624-I1.
Filing B00318624-I1 reached an approved status.
Interior renovation in tank room at cellar space. Filing B00455044-I1.
Filing B00455044-I1 reached an approved status.
Nycha boiler - :removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room. Filing B00435284-I1.
Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439629-I1.
Filing B00439629-I1 reached an approved status.
Nycha boiler - structural work for interior renovation replacing concrete pads. Filing B00434040-I1.
Filing B00434040-I1 reached an approved status.
Filing B00435284-I1 reached an approved status.
DOB lists a first permit date for B00318624-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence as per plans filed herewith. no change to use, egress or occupancy. Filing B00583719-I1.
DOB lists a first permit date for B00583719-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00583719-I1.
The latest status recorded for B00583719-I1 is “LOC Issued.”
DOB recorded a sign-off for B00318624-I1.
The latest status recorded for B00318624-I1 is “LOC Issued.”
Nycha boiler - structural work for interior renovation replacing concrete pads. Filing B00434040-P1.
Filing B00434040-P1 reached an approved status.
The latest status recorded for B00434040-P1 is “Approved.”
Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439629-P1.
Filing B00439629-P1 reached an approved status.
The latest status recorded for B00439629-P1 is “Approved.”
Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439629-P2.
Filing B00439629-P2 reached an approved status.
The latest status recorded for B00439629-P2 is “Approved.”
Nycha boiler - :removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room. Filing B00435284-P1.
Filing B00435284-P1 reached an approved status.
The latest status recorded for B00435284-P1 is “Approved.”
DOB lists a first permit date for B00455044-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00434040-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00435284-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00439629-I1. That is not by itself confirmation of activity on site.
Nycha boiler - removal and replacement of plumbing and associated piping for interior renovation of mechanical equipment room. Filing B00439629-P3.
Filing B00439629-P3 reached an approved status.
The latest status recorded for B00439629-P3 is “Approved.”
The latest status recorded for B00439629-I1 is “Permit Entire.”
The latest status recorded for B00435284-I1 is “Permit Entire.”
The latest status recorded for B00434040-I1 is “Permit Entire.”
DOB recorded a sign-off for B00455044-I1.
The latest status recorded for B00455044-I1 is “LOC Issued.”