Building record · BIN 3324971

230 7 Avenue

230 7 Avenue, Brooklyn, NY 11215

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 0 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3324971

230 7 Avenue

Park Slope, Brooklyn

A consolidated public-record view · updated Sep 8, 2026

DOB filings
2
Active-status
0
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings2
Open or active-status records0
First included filingJan 8, 2026
Latest recorded changeSep 8, 2026

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3324971. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 2 alteration filing. Its latest status categories are 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 8, 2026
Latest recorded change
Sep 8, 2026
Highest proposed story count
Not stated
Highest proposed unit count
6 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 230 7 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    New boiler on the 1st floor as per plans filed. Filing B01331659-S1.

    01
  2. Alteration filed

    Install new tankless boiler and hwh storage tank and floor drain on the 1st floor, install new gas line in the cellar from the existing gas meter to new boiler room on the 1st floor. Filing B01331659-I1.

    02
  3. Alteration approved

    Filing B01331659-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B01331659-S1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B01331659-S1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B01331659-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration signed off

    DOB recorded a sign-off for B01331659-S1.

    07
  8. Alteration now completed

    The latest status recorded for B01331659-S1 is “LOC Issued.”

    08
  9. Alteration signed off

    DOB recorded a sign-off for B01331659-I1.

    09
  10. Alteration now completed

    The latest status recorded for B01331659-I1 is “LOC Issued.”

    010