Building record · BIN 3325593

603 Park Avenue

603 Park Avenue, Brooklyn, NY 11206

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3325593

603 Park Avenue

Bedford-Stuyvesant (West), Brooklyn

A consolidated public-record view · updated Jul 17, 2023

DOB filings
6
Active-status
6
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records6
First included filingJul 22, 2021
Latest recorded changeJul 17, 2023

The lot

What is already here?

The lot holds a 6-story elevator apartment building built in 1958, with 72 homes, on a 616,250 sq ft lot.

  1. Floors 2–6Homes72 homes are recorded on this lot — about 14 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as mixed residential and commercial, so this floor is where the commercial space is.
  • Street levelMixed residential and commercial
  • Homes72 recorded on the lot
  • Above the southern skylineFrom about floor 7 — the tallest thing within 60 m to the south is 19.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 20.4 m over 6 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1958
Last altered
2025
Floors
6
Residential units
72
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
616,250 sq ft
Building area
822,192 sq ft

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3325593. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 6 alteration filing. Its latest status categories are 6 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jul 22, 2021
Latest recorded change
Jul 17, 2023
Highest proposed story count
6 stories
Highest proposed unit count
118 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 603 Park Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    NYCHA Boilers- Provide vacuum/condensate pump and condensate transfer pumps with surge tank including associated piping, valves and accessories. Provide temporary condensate pump and temporary boiler feed unit including associated piping, and accessoriess. Filing B00563033-I1.

    01
  2. Alteration filed

    Nycha boiler- remove existing pilot and gas piping to existing building #9 boiler. provide new low pressure gas service for existing boiler room building#9. provide new meter/regulator per utility requirements. Filing B00563033-S2.

    02
  3. Alteration filed

    NYCHA BOILER - Removal of boilers and related equipment, replacement of equipment to remain, and related minor exterior work. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Filing B00563033-S3.

    03
  4. Alteration filed

    Nycha boiler- structural filing for removal of boilers. Filing B00563033-S4.

    04
  5. Alteration approved

    Filing B00563033-I1 reached an approved status.

    05
  6. Alteration approved

    Filing B00563033-S2 reached an approved status.

    06
  7. Alteration filed

    Nycha boiler - 7 existing boilers to be removed by contractor. remove breeching, steam and condensate return piping to existing boiler, associated valves, fuel oil pipes, controls and supports. Filing B00563033-S1.

    07
  8. Alteration approved

    Filing B00563033-S1 reached an approved status.

    08
  9. Alteration approved

    Filing B00563033-S3 reached an approved status.

    09
  10. Alteration approved

    Filing B00563033-S4 reached an approved status.

    010
  11. Alteration filed

    NYCHA Boilers- Provide vacuum/condensate pump and condensate transfer pumps with surge tank including associated piping, valves and accessories. Provide temporary condensate pump and temporary boiler feed unit including associated piping, and accessoriess. Filing B00563033-P1.

    011
  12. Alteration now approved

    The latest status recorded for B00563033-S2 is “Approved.”

    012
  13. Alteration now approved

    The latest status recorded for B00563033-I1 is “Approved.”

    013
  14. Alteration approved

    Filing B00563033-P1 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for B00563033-P1 is “Approved.”

    015
  16. Alteration now approved

    The latest status recorded for B00563033-S1 is “Approved.”

    016
  17. Alteration now approved

    The latest status recorded for B00563033-S3 is “Approved.”

    017
  18. Alteration now approved

    The latest status recorded for B00563033-S4 is “Approved.”

    018