DOB filing B00962390-P5
Alteration filing at 1229 Greene Avenue
Building record · BIN 3325684
1229 Greene Avenue, Brooklyn, NY 11221
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3325684
1229 Greene Avenue
Bushwick (East), Brooklyn
A consolidated public-record view · updated Sep 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 3-story walk-up apartment building built in 1982, with 72 homes, on a 105,175 sq ft lot.
Owner of record
HOPE GARDENS 1 LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 4 open notices on record for this building, out of 9 notices on file; the most recent was issued Jun 30, 2023.
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3325684. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 4 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1229 Greene Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Replacement of existing boiler(s) as per submitted plans due to hurricane ida. Filing B00606716-I1.
Filing B00606716-I1 reached an approved status.
DOB lists a first permit date for B00606716-I1. That is not by itself confirmation of activity on site.
Replacement of existing boiler(s) as per submitted plans due to hurricane ida. Filing B00606716-P1.
Filing B00606716-P1 reached an approved status.
The latest status recorded for B00606716-P1 is “Approved.”
Restoration of water-damaged apartments as a result of inundation from hurricane ida. no change to use, egress, occupancy, or fire protection. areas of work listed in location information and comments sections. Filing B00619899-I1.
Filing B00619899-I1 reached an approved status.
DOB lists a first permit date for B00619899-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00619899-I1.
The latest status recorded for B00619899-I1 is “LOC Issued.”
Replacement of existing boiler(s) as per submitted plans due to hurricane ida. Filing B00606716-P2.
Filing B00606716-P2 reached an approved status.
The latest status recorded for B00606716-P2 is “Approved.”
DOB recorded a sign-off for B00606716-I1.
The latest status recorded for B00606716-I1 is “LOC Issued.”
Decommission and abandon in place existing indirect domestic water heaters, recirculation pump, and associated piping with valves; provide new domestic water and gas piping from the cel to a new boiler pod. no changes to use, egress, or occupancy. Filing B00962390-S1.
Filing B00962390-S1 reached an approved status.
DOB lists a first permit date for B00962390-S1. That is not by itself confirmation of activity on site.
Decommission and abandon in place existing indirect domestic water heaters, recirculation pump, and associated piping with valves; provide new domestic water and gas piping from the cel to a new boiler pod. no changes to use, egress, or occupancy. Filing B00962390-P5.
Filing B00962390-P5 reached an approved status.
The latest status recorded for B00962390-P5 is “Approved.”
The latest status recorded for B00962390-S1 is “Permit Entire.”