DOB filing B00379505-I1
Alteration filing at 190 York Street
Building record · BIN 3325904
190 York Street, Brooklyn, NY 11201
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3325904
190 York Street
Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn
A consolidated public-record view · updated Nov 7, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14-story elevator apartment building built in 1950, with 417 homes, on a 185,030 sq ft lot.
What it sold for
4 apartments on this tax block changed hands in the year the city last published, at a median of $415,000, from 125,000 to 420,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
NYC HOUSING AUTHORITY
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 28 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3325904. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 8 recorded as completed, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 190 York Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filing plans for temporary fence construction to enclose temporary boilers filed under job no: 321728172. Filing B00228136-I1.
Filing B00228136-I1 reached an approved status.
Installation of new sidewalk shed at 190 york street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00230027-I1.
Installation of temporary construction fence at 190 york street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00230039-I1.
DOB lists a first permit date for B00230027-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00230039-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00228136-I1. That is not by itself confirmation of activity on site.
Installation of new gas meter and new high pressure gas piping to new temporary gas boiler filed under separate application by the boiler rental company. And also installing new water piping from existing boiler feed tank to the temp boilers. Filing B00266483-I1.
Filing B00266483-I1 reached an approved status.
DOB lists a first permit date for B00266483-I1. That is not by itself confirmation of activity on site.
Installation of new gas meter and new high pressure gas piping to new temporary gas boiler filed under separate application by the boiler rental company. And also installing new water piping from existing boiler feed tank to the temp boilers. Filing B00266483-P1.
Filing B00266483-P1 reached an approved status.
Removal of (2) 20,000 gallon underground fuel oil storage tanks. no change to use, egress or occupancy. Filing B00332329-I1.
Installation of a wood construction fence filed in conjunction with the removal of underground fuel oil storage tanks filed under separate application. no change to use, egress or occupancy. Filing B00332344-I1.
Filing B00332329-I1 reached an approved status.
Filing B00332344-I1 reached an approved status.
DOB lists a first permit date for B00332329-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00332344-I1. That is not by itself confirmation of activity on site.
Existing underground steam distribution piping is to be abandoned in place and new piping installed parallel as replacement. no change in use, egress or occupancy under this application. Filing B00379505-I1.
Filing B00379505-I1 reached an approved status.
The latest status recorded for B00266483-P1 is “Approved.”
The latest status recorded for B00228136-I1 is “Permit Entire.”
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00459070-I1.
DOB lists a first permit date for B00459070-I1. That is not by itself confirmation of activity on site.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00459075-I1.
DOB lists a first permit date for B00459075-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00459081-I1.
DOB lists a first permit date for B00459081-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00459070-P1.
Filing B00459070-P1 reached an approved status.
The latest status recorded for B00459070-P1 is “Approved.”
DOB recorded a sign-off for B00332329-I1.
The latest status recorded for B00332329-I1 is “LOC Issued.”
DOB recorded a sign-off for B00332344-I1.
The latest status recorded for B00332344-I1 is “LOC Issued.”
The latest status recorded for B00266483-I1 is “Permit Entire.”
DOB recorded a sign-off for B00230027-I1.
The latest status recorded for B00230027-I1 is “LOC Issued.”
DOB recorded a sign-off for B00230039-I1.
The latest status recorded for B00230039-I1 is “LOC Issued.”
DOB recorded a sign-off for B00459081-I1.
The latest status recorded for B00459081-I1 is “LOC Issued.”
DOB recorded a sign-off for B00459070-I1.
The latest status recorded for B00459070-I1 is “LOC Issued.”
DOB recorded a sign-off for B00459075-I1.
The latest status recorded for B00459075-I1 is “LOC Issued.”
DOB lists a first permit date for B00379505-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00379505-I1.
The latest status recorded for B00379505-I1 is “LOC Issued.”