Building record · BIN 3326170

180 Palmetto Street

180 Palmetto Street, Brooklyn, NY 11221

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3326170

180 Palmetto Street

Bushwick (East), Brooklyn

A consolidated public-record view · updated Sep 20, 2026

DOB filings
7
Active-status
4
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings7
Open or active-status records4
First included filingOct 30, 2019
Latest recorded changeSep 20, 2026

The lot

What is already here?

The lot holds a 3-story walk-up apartment building built in 1983, with 96 homes, on a 120,200 sq ft lot.

  1. Floors 2–3Homes96 homes are recorded on this lot — about 48 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as walk-up apartments.
  • Street levelWalk-up apartments
  • Homes96 recorded on the lot
  • Above the southern skylineFrom about floor 4 — the tallest thing within 60 m to the south is 10.9 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 11.8 m over 3 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1983
Floors
3
Residential units
96
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
120,200 sq ft
Building area
99,040 sq ft

Housing violations

16 violations are open against this address under the Housing Maintenance Code. 7 of them are the class the city calls immediately hazardous.

  • 7Immediately hazardous
  • 9Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

HOPE GARDENS 1 LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 3 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3326170. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 7 alteration filing. Its latest status categories are 4 approved, 3 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 30, 2019
Latest recorded change
Sep 20, 2026
Highest proposed story count
3 stories
Highest proposed unit count
12 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 180 Palmetto Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of fence as per plans. no change in use, egress or occupancy. Filing B00240894-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00240894-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Replacement of existing boiler(s) as per submitted plans due to hurricane ida. Filing B00607051-I1.

    03
  4. Alteration approved

    Filing B00607051-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for B00607051-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Replacement of existing boiler(s) as per submitted plans due to hurricane ida. Filing B00607051-P1.

    06
  7. Alteration approved

    Filing B00607051-P1 reached an approved status.

    07
  8. Alteration now approved

    The latest status recorded for B00607051-P1 is “Approved.”

    08
  9. Alteration filed

    Restoration of water-damaged common area as a result of inundation from hurricane ida. no change to use, egress, occupancy, or fire protection. areas of work listed in location information and comments sections. Filing B00619255-I1.

    09
  10. Alteration approved

    Filing B00619255-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00619255-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    Replacement of existing boiler(s) as per submitted plans due to hurricane ida. Filing B00607051-P2.

    012
  13. Alteration approved

    Filing B00607051-P2 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00607051-P2 is “Approved.”

    014
  15. Alteration signed off

    DOB recorded a sign-off for B00619255-I1.

    015
  16. Alteration now completed

    The latest status recorded for B00619255-I1 is “LOC Issued.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for B00240894-I1.

    017
  18. Alteration now completed

    The latest status recorded for B00240894-I1 is “LOC Issued.”

    018
  19. Alteration signed off

    DOB recorded a sign-off for B00607051-I1.

    019
  20. Alteration now completed

    The latest status recorded for B00607051-I1 is “LOC Issued.”

    020
  21. Alteration filed

    Mechanical work in conjunction with renovation of 3-story nycha multiple dwelling; no changes to use, egress, or occupancy. Filing B00963108-I1.

    021
  22. Alteration approved

    Filing B00963108-I1 reached an approved status.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for B00963108-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration filed

    Mechanical work in conjunction with renovation of 3-story nycha multiple dwelling; no changes to use, egress, or occupancy. Filing B00963108-P6.

    024
  25. Alteration approved

    Filing B00963108-P6 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00963108-P6 is “Approved.”

    026
  27. Alteration now approved

    The latest status recorded for B00963108-I1 is “Permit Entire.”

    027