Building record · BIN 3326172

200 Palmetto Street

200 Palmetto Street, Brooklyn, NY 11221

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3326172

200 Palmetto Street

Bushwick (East), Brooklyn

A consolidated public-record view · updated Jul 14, 2022

DOB filings
5
Active-status
3
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings5
Open or active-status records3
First included filingFeb 20, 2020
Latest recorded changeJul 14, 2022

The lot

What is already here?

The lot holds a 3-story walk-up apartment building built in 1983, with 96 homes, on a 120,200 sq ft lot.

Built
1983
Floors
3
Residential units
96
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
120,200 sq ft
Building area
99,040 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3326172. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 alteration filing. Its latest status categories are 2 recorded as completed, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 20, 2020
Latest recorded change
Jul 14, 2022
Highest proposed story count
3 stories
Highest proposed unit count
96 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 200 Palmetto Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of two subsurface storage systems to collect and store stormwater runoff. The systems will be located beneath existing parking lots. Filing B00276396-I1.

    01
  2. Alteration approved

    Filing B00276396-I1 reached an approved status.

    02
  3. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447948-I1.

    03
  4. Alteration approved

    Filing B00447948-I1 reached an approved status.

    04
  5. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447948-P1.

    05
  6. Alteration approved

    Filing B00447948-P1 reached an approved status.

    06
  7. Alteration now approved

    The latest status recorded for B00447948-P1 is “Approved.”

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00276396-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00447948-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447948-P2.

    010
  11. Alteration approved

    Filing B00447948-P2 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00447948-P2 is “Approved.”

    012
  13. Alteration signed off

    DOB recorded a sign-off for B00276396-I1.

    013
  14. Alteration now completed

    The latest status recorded for B00276396-I1 is “LOC Issued.”

    014
  15. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447948-P5.

    015
  16. Alteration approved

    Filing B00447948-P5 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00447948-P5 is “Approved.”

    017
  18. Alteration signed off

    DOB recorded a sign-off for B00447948-I1.

    018
  19. Alteration now completed

    The latest status recorded for B00447948-I1 is “LOC Issued.”

    019