Building record · BIN 3326292

580 Central Avenue

580 Central Avenue, Brooklyn, NY 11207

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3326292

580 Central Avenue

Bushwick (East), Brooklyn

A consolidated public-record view · updated Sep 21, 2026

DOB filings
10
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings10
Open or active-status records6
First included filingSep 19, 2019
Latest recorded changeSep 21, 2026

The lot

What is already here?

The lot holds a 3-story walk-up apartment building built in 1983, with 24 homes, on a 44,071 sq ft lot.

  1. Floors 2–3Homes24 homes are recorded on this lot — about 12 homes to a floor, and the apartments assessed on this block run to a typical 1,026 sq ft (95 m²). The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as walk-up apartments.
  • Street levelWalk-up apartments
  • Homes24 recorded · typically 95 m² · valued $374,274
  • Above the southern skylineFrom about floor 4 — the tallest thing within 60 m to the south is 11.8 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 10.5 m over 3 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1983
Floors
3
Residential units
24
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
44,071 sq ft
Building area
23,940 sq ft

The apartments

8 condominium apartments are assessed on this block, and the typical one is 1,026 sq ft (95 m²). They run from 95 to 139 m².

The city values the typical one at $374,274. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

Owner of record

127 ELDERT LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 5 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3326292. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 10 alteration filing. Its latest status categories are 6 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 19, 2019
Latest recorded change
Sep 21, 2026
Highest proposed story count
3 stories
Highest proposed unit count
24 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 580 Central Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of plywood fence as per plans. no change in use, egress or occupancy. Filing B00230442-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00230442-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of two subsurface storage systems to collect and store stormwater runoff. The systems will be located beneath existing parking lots. Filing B00275895-I1.

    03
  4. Alteration approved

    Filing B00275895-I1 reached an approved status.

    04
  5. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447941-I1.

    05
  6. Alteration approved

    Filing B00447941-I1 reached an approved status.

    06
  7. Alteration filed

    Installation of two subsurface storage systems to collect and store stormwater runoff. The systems will be located beneath existing parking lots. Filing B00275895-P1.

    07
  8. Alteration approved

    Filing B00275895-P1 reached an approved status.

    08
  9. Alteration now approved

    The latest status recorded for B00275895-P1 is “Approved.”

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00275895-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00447941-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447941-P1.

    012
  13. Alteration approved

    Filing B00447941-P1 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00447941-P1 is “Approved.”

    014
  15. Alteration filed

    Installation of two subsurface storage systems to collect and store stormwater runoff. The systems will be located beneath existing parking lots. Filing B00275895-P2.

    015
  16. Alteration approved

    Filing B00275895-P2 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00275895-P2 is “Approved.”

    017
  18. Alteration filed

    General construction activities for the installation of an underground stormwater storage and associated piping and inlets. Area of excavation is in the parking lot of the building. Filing B00447941-P2.

    018
  19. Alteration approved

    Filing B00447941-P2 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for B00447941-P2 is “Approved.”

    020
  21. Alteration signed off

    DOB recorded a sign-off for B00447941-I1.

    021
  22. Alteration now completed

    The latest status recorded for B00447941-I1 is “LOC Issued.”

    022
  23. Alteration signed off

    DOB recorded a sign-off for B00275895-I1.

    023
  24. Alteration now completed

    The latest status recorded for B00275895-I1 is “LOC Issued.”

    024
  25. Alteration filed

    Restoration of water-damaged apartments as a result of inundation from hurricane ida. no change to use, egress, occupancy, or fire protection. areas of work listed in location information and comments sections. Filing B00636794-I1.

    025
  26. Alteration approved

    Filing B00636794-I1 reached an approved status.

    026
  27. Alteration signed off

    DOB recorded a sign-off for B00230442-I1.

    027
  28. Alteration now completed

    The latest status recorded for B00230442-I1 is “LOC Issued.”

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for B00636794-I1. That is not by itself confirmation of activity on site.

    029
  30. Alteration signed off

    DOB recorded a sign-off for B00636794-I1.

    030
  31. Alteration now completed

    The latest status recorded for B00636794-I1 is “LOC Issued.”

    031
  32. Alteration filed

    Minor mechanical work filed in conjunction with renovation of 3-story nycha multiple dwelling throughout; no changes to use, egress, or occupancy. Filing B00958986-I1.

    032
  33. Alteration approved

    Filing B00958986-I1 reached an approved status.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for B00958986-I1. That is not by itself confirmation of activity on site.

    034
  35. Alteration filed

    Minor mechanical work filed in conjunction with renovation of 3-story nycha multiple dwelling throughout; no changes to use, egress, or occupancy. Filing B00958986-P2.

    035
  36. Alteration approved

    Filing B00958986-P2 reached an approved status.

    036
  37. Alteration now approved

    The latest status recorded for B00958986-P2 is “Approved.”

    037
  38. Alteration now approved

    The latest status recorded for B00958986-I1 is “Permit Entire.”

    038