DOB filing B00596291-S1
Alteration filing at 888 Park Avenue
Building record · BIN 3326366
888 Park Avenue, Brooklyn, NY 11206
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3326366
888 Park Avenue
Bedford-Stuyvesant (East), Brooklyn
A consolidated public-record view · updated Nov 18, 2025
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story elevator apartment building built in 1951, with 1099 homes, on a 504,500 sq ft lot.
Housing violations
8 violations are open against this address under the Housing Maintenance Code.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
Owner of record
NYC HOUSING AUTHORITY
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 12 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3326366. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 17 alteration filing. Its latest status categories are 11 approved, 6 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 888 Park Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Applying for temporary sidewalk shed on behalf of the building owner. Filing B00185585-I1.
DOB lists a first permit date for B00185585-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence as per plans. no change in use, egress or occupancy. Filing B00262244-I1.
DOB lists a first permit date for B00262244-I1. That is not by itself confirmation of activity on site.
Installation of new sidewalk shed at 878 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266479-I1.
Installation of temporary construction fence at 878 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266489-I1.
Installation of pipe scaffold at 878 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266498-I1.
DOB lists a first permit date for B00266489-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00266498-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00266479-I1. That is not by itself confirmation of activity on site.
Facade restoration work as per indicated on plan. there will be no change in the use, egress or occupancy under this application. Filing B00509997-I1.
Filing B00509997-I1 reached an approved status.
Facade restoration work as per indicated on plan. there will be no change in the use, egress or occupancy under this application. Filing B00509997-P1.
Filing B00509997-P1 reached an approved status.
The latest status recorded for B00509997-P1 is “Approved.”
DOB lists a first permit date for B00509997-I1. That is not by itself confirmation of activity on site.
Installation of temporary construction fence at 878 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266489-P1.
Installation of new sidewalk shed at 878 park avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00266479-P1.
Filing B00266479-P1 reached an approved status.
The latest status recorded for B00266479-P1 is “Approved.”
Filing B00266489-P1 reached an approved status.
The latest status recorded for B00266489-P1 is “Approved.”
NYCHA Sumner BOILER- BLDG # 2- Architectural work being filed for repair to existing Mechanical room. Filing B00596291-I1.
NYCHA Sumner BOILER Bldg #2_ PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00596291-S1.
Civil work -nycha sumner houses building # 2. Filing B00596291-S4.
Filing B00596291-S4 reached an approved status.
NYCHA-Sumner Bldg #2 Structural Work filed to provide steel reinforcing for new louver opening on non-load bearing masonry wall or foundation wall. Provide interior concrete pad for MEP equipment. Provide outdoor flue and cladding frame support. Filing B00596291-S6.
DOB recorded a sign-off for B00266479-I1.
The latest status recorded for B00266479-I1 is “LOC Issued.”
DOB recorded a sign-off for B00266489-I1.
The latest status recorded for B00266489-I1 is “LOC Issued.”
DOB recorded a sign-off for B00266498-I1.
The latest status recorded for B00266498-I1 is “LOC Issued.”
DOB recorded a sign-off for B00509997-I1.
The latest status recorded for B00509997-I1 is “LOC Issued.”
NYCHA-Sumner Bldg #2 Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing DHWH. Install of temp. condensate pump, fresh air intake and exhaust flue for DHWH. Filing B00596291-S5.
Filing B00596291-S1 reached an approved status.
Filing B00596291-S6 reached an approved status.
Filing B00596291-S5 reached an approved status.
Filing B00596291-I1 reached an approved status.
DOB recorded a sign-off for B00262244-I1.
The latest status recorded for B00262244-I1 is “LOC Issued.”
DOB recorded a sign-off for B00185585-I1.
The latest status recorded for B00185585-I1 is “LOC Issued.”
Civil work -nycha sumner houses building # 2. Filing B00596291-P4.
Filing B00596291-P4 reached an approved status.
The latest status recorded for B00596291-P4 is “Approved.”
DOB lists a first permit date for B00596291-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596291-S4. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596291-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596291-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00596291-S1. That is not by itself confirmation of activity on site.
NYCHA Sumner BOILER Bldg #2_ PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00596291-P5.
Filing B00596291-P5 reached an approved status.
The latest status recorded for B00596291-P5 is “Approved.”
NYCHA Sumner BOILER Bldg #2_ PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00596291-P6.
Filing B00596291-P6 reached an approved status.
The latest status recorded for B00596291-P6 is “Approved.”
The latest status recorded for B00596291-I1 is “Permit Entire.”
The latest status recorded for B00596291-S4 is “Permit Entire.”
The latest status recorded for B00596291-S6 is “Permit Entire.”
The latest status recorded for B00596291-S5 is “Permit Entire.”
The latest status recorded for B00596291-S1 is “Permit Entire.”