DOB filing B01428407-S3
Alteration filing at 2955 Bedford Avenue
Building record · BIN 3327317
2955 Bedford Avenue, Brooklyn, NY 11210
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3327317
2955 Bedford Avenue
Flatbush, Brooklyn
A consolidated public-record view · updated Sep 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story educational building built in 1900, on a 720,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 31 open notices on record for this building, out of 94 notices on file; the most recent was issued Oct 7, 2019.
Issued Oct 7, 2019
Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Issued Sep 13, 2018
28 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3327317. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 5 under review, 5 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2955 Bedford Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary construction fence at 2955 bedford avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00360979-I1.
DOB lists a first permit date for B00360979-I1. That is not by itself confirmation of activity on site.
Sidewalk shed installation as per plan. no change in use, egress or occupancy. Filing B00363436-I1.
Supported Scaffold for Facade Work. Filing B00364896-I1.
DOB lists a first permit date for B00364896-I1. That is not by itself confirmation of activity on site.
Supported Scaffold. Filing B00364896-S1.
Filing B00363436-I1 reached an approved status.
DOB lists a first permit date for B00364896-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00363436-I1. That is not by itself confirmation of activity on site.
Installation of sidewalk shed as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2014 b.c. Filing B00362981-I1.
DOB lists a first permit date for B00362981-I1. That is not by itself confirmation of activity on site.
Supported Scaffold. Filing B00364896-P1.
Filing B00364896-P1 reached an approved status.
Supported Scaffold. Filing B00364896-P2.
Filing B00364896-P2 reached an approved status.
DOB recorded a sign-off for B00362981-I1.
The latest status recorded for B00362981-I1 is “LOC Issued.”
The latest status recorded for B00364896-P1 is “Approved.”
The latest status recorded for B00364896-P2 is “Approved.”
DOB recorded a sign-off for B00363436-I1.
The latest status recorded for B00363436-I1 is “LOC Issued.”
DOB recorded a sign-off for B00364896-I1.
The latest status recorded for B00364896-I1 is “LOC Issued.”
DOB recorded a sign-off for B00360979-I1.
The latest status recorded for B00360979-I1 is “LOC Issued.”
DOB recorded a sign-off for B00364896-S1.
The latest status recorded for B00364896-S1 is “LOC Issued.”
Demolition of non-load-bearing partitions, doors, casework, ceilings, and finishes at partial areas of the 1st, 2nd, 3rd, and 4th floors, as indicated on plans filed herewith. No change in use, egress, or occupancy. Filing B01428407-I1.
Demolition of existing mechanical systems and associated equipment at basement thru 5th floors and penthouse in preparation for future renovation. No change in use, egress or occupancy. Filing B01428407-S1.
Installation of new wet sprinkler system: new sprinkler heads, branch piping, new booster and jockey pumps w/ controllers, tied into existing risers/mains to remain. No change in egress, occupancy or use. Filing B01428407-S3.
Demolition of existing plumbing fixtures, lab stations, fume hoods and associated piping at basement, 1st, 3rd and 4th floors in preparation for future renovation. No change in use, egress or occupancy. Filing B01428407-S2.
The latest status recorded for B01428407-S1 is “Objections.”
The latest status recorded for B01428407-I1 is “Objections.”
The latest status recorded for B01428407-S3 is “Pending Plan Examiner Assignment.”
The latest status recorded for B01428407-S2 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”
Structural modifications as shown on plans filed herewith. No change in egress, occupancy or use. Filing B01428407-S4.
The latest status recorded for B01428407-S4 is “Pending Plan Examiner Assignment.”