DOB filing B01235948-S3
Alteration filing at 2895 Bedford Avenue
Building record · BIN 3327322
2895 Bedford Avenue, Brooklyn, NY 11210
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3327322
2895 Bedford Avenue
Flatbush, Brooklyn
A consolidated public-record view · updated Sep 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story educational building built in 1900, on a 720,000 sq ft lot.
The apartments
38 condominium apartments are assessed on this block, and the typical one is 580 sq ft (54 m²). They run from 45 to 71 m².
The city values the typical one at $221,616. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
Owner of record
BARMAT REALTY CO
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 53 open notices on record for this building, out of 285 notices on file; the most recent was issued Sep 16, 2021.
Issued Sep 16, 2021
Issued Nov 13, 2020
Issued Oct 8, 2019
50 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3327322. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 2 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2895 Bedford Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Boylan hall: high-pressure steam pipe demo; meter install, chilled water/condensate pipe demo; meter install, wire/conduit. no change of use, egress, or occupancy. Filing B00573466-I1.
Filing B00573466-I1 reached an approved status.
DOB lists a first permit date for B00573466-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00573466-I1.
The latest status recorded for B00573466-I1 is “LOC Issued.”
Remove and replace existing secondary RPZ. Filing B01235948-S3.
Filing B01235948-S3 reached an approved status.
DOB lists a first permit date for B01235948-S3. That is not by itself confirmation of activity on site.
Site civil plumbing work. Filing B01235948-P5.
DOB recorded a sign-off for B01235948-S3.
The latest status recorded for B01235948-S3 is “LOC Issued.”
The latest status recorded for B01235948-P5 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”