DOB filing B00621060-S1
Alteration filing at 451 Clarkson Avenue
Building record · BIN 3327711
451 Clarkson Avenue, Brooklyn, NY 11203
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3327711
451 Clarkson Avenue
Prospect Lefferts Gardens-Wingate, Brooklyn
A consolidated public-record view · updated Sep 29, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story health facility built in 1930, on a 891,577 sq ft lot.
Owner of record
HEALTH & HOSP CORP
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 29 open notices on record for this building, out of 214 notices on file; the most recent was issued Apr 29, 2026.
Issued Apr 29, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00621114-I1 ON 11/18/25. CONTRACTOR WITHDRAWAL
Issued Apr 29, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #310103553 ON 8/19/2020 DUE TO CONTRACTOR WITHDRAWAL
Issued Aug 20, 2020 — STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE
26 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3327711. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 16 alteration filing. Its latest status categories are 1 under review, 14 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 451 Clarkson Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. Filing B00157495-I1.
Filing B00157495-I1 reached an approved status.
DOB lists a first permit date for B00157495-I1. That is not by itself confirmation of activity on site.
Acid/bicarbonate distribution piping and drainage. Filing B00274736-I1.
Filing B00274736-I1 reached an approved status.
Installation of a new kitchen sink, cooler-water supply a refrigerator drainage line. Filing B00306288-I1.
Filing B00306288-I1 reached an approved status.
DOB lists a first permit date for B00306288-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00157495-I1 is “Permit Entire.”
The latest status recorded for B00274736-I1 is “Approved.”
The latest status recorded for B00306288-I1 is “Permit Entire.”
Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope. Filing B00458087-I1.
Filing B00458087-I1 reached an approved status.
DOB lists a first permit date for B00458087-I1. That is not by itself confirmation of activity on site.
Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope. Filing B00458087-P1.
Filing B00458087-P1 reached an approved status.
The latest status recorded for B00458087-P1 is “Approved.”
Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope. Filing B00458087-P2.
Filing B00458087-P2 reached an approved status.
The latest status recorded for B00458087-P2 is “Approved.”
Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-I1.
Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy. Filing B00621025-I1.
Remove/ replace sprinklers with new heads and piping; install temporary sprinkler protection as per plans. Remove plumbing fixtures and install newon 2nd flor. install med medical gas piping cellar through 2nd floor. Filing B00621114-I1.
Filing B00621060-I1 reached an approved status.
Filing B00621114-I1 reached an approved status.
Filing B00621025-I1 reached an approved status.
DOB recorded a sign-off for B00458087-I1.
The latest status recorded for B00458087-I1 is “LOC Issued.”
Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-P1.
Remove and install new ductwork, AHU and chiller as per plans filed herewith for the O.R. on partial 2nd floor, C Building, in the existing hospital as per plans filed herewith. Filing B00621071-I1.
Filing B00621071-I1 reached an approved status.
Filing B00621060-P1 reached an approved status.
The latest status recorded for B00621060-P1 is “Approved.”
DOB lists a first permit date for B00621060-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621071-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621025-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621114-I1. That is not by itself confirmation of activity on site.
Removal and installation of interior non-bearing partitions, and related finishes as per drawings filed herewith. no change to egress, occupancy or use. Filing B01191852-I1.
Kings county hospital center - ed expansion - mechanical modifications as per plans filed herewith. no change in use egress, or occupancy. Filing B01191852-S3.
Filing B01191852-I1 reached an approved status.
DOB lists a first permit date for B01191852-I1. That is not by itself confirmation of activity on site.
Filing B01191852-S3 reached an approved status.
DOB lists a first permit date for B01191852-S3. That is not by itself confirmation of activity on site.
The latest status recorded for B00621071-I1 is “Permit Entire.”
Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy. Filing B00621025-P1.
Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-P2.
The latest status recorded for B00621025-I1 is “Permit Entire.”
Filing B00621025-P1 reached an approved status.
The latest status recorded for B00621025-P1 is “Approved.”
The latest status recorded for B00621060-I1 is “Permit Entire.”
Filing B00621060-P2 reached an approved status.
The latest status recorded for B00621060-P2 is “Approved.”
Construct new footing to accomodate HVAC equipment on the roof. (Refer to B00621071-I1 for mechanical equipment.). Filing B00621060-S1.
The latest status recorded for B01191852-S3 is “Permit Entire.”
The latest status recorded for B01191852-I1 is “Permit Entire.”
The latest status recorded for B00621114-I1 is “Permit Entire.”
The latest status recorded for B00621060-S1 is “Plan Examiner Review.”