DOB filing B00621060-S1
Alteration filing at 451 Clarkson Avenue
Building record · BIN 3327711
451 Clarkson Avenue, Brooklyn, NY 11203
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story health facility built in 1930, on a 891,577 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3327711. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 1 under review, 6 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 451 Clarkson Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-I1.
Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy. Filing B00621025-I1.
Remove/ replace sprinklers with new heads and piping; install temporary sprinkler protection as per plans. Remove plumbing fixtures and install newon 2nd flor. install med medical gas piping cellar through 2nd floor. Filing B00621114-I1.
Filing B00621060-I1 reached an approved status.
Filing B00621114-I1 reached an approved status.
Filing B00621025-I1 reached an approved status.
Remove and install new ductwork, AHU and chiller as per plans filed herewith for the O.R. on partial 2nd floor, C Building, in the existing hospital as per plans filed herewith. Filing B00621071-I1.
Filing B00621071-I1 reached an approved status.
DOB lists a first permit date for B00621060-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621071-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621025-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00621114-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00621114-I1 is “Permit Entire.”
The latest status recorded for B00621071-I1 is “Permit Entire.”
Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy. Filing B00621025-P1.
Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-P2.
The latest status recorded for B00621025-I1 is “Permit Entire.”
Filing B00621025-P1 reached an approved status.
The latest status recorded for B00621025-P1 is “Approved.”
The latest status recorded for B00621060-I1 is “Permit Entire.”
Filing B00621060-P2 reached an approved status.
The latest status recorded for B00621060-P2 is “Approved.”
Construct new footing to accomodate HVAC equipment on the roof. (Refer to B00621071-I1 for mechanical equipment.). Filing B00621060-S1.
The latest status recorded for B00621060-S1 is “Objections.”