Building record · BIN 3327711

451 Clarkson Avenue

451 Clarkson Avenue, Brooklyn, NY 11203

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3327711

451 Clarkson Avenue

Prospect Lefferts Gardens-Wingate, Brooklyn

A consolidated public-record view · updated Sep 29, 2026

DOB filings
16
Active-status
15
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings16
Open or active-status records15
First included filingApr 22, 2019
Latest recorded changeSep 29, 2026

The lot

What is already here?

The lot holds a 5-story health facility built in 1930, on a 891,577 sq ft lot.

  1. Floors 2–5Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
Drawn from the outline and roof height the Department of City Planning publishes for this building: 78.3 m over 5 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor.
Built
1930
Last altered
2006
Floors
5
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R5
Lot area
891,577 sq ft
Building area
1,503,150 sq ft

Owner of record

HEALTH & HOSP CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 29 open notices on record for this building, out of 214 notices on file; the most recent was issued Apr 29, 2026.

  • Construction

    Issued Apr 29, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00621114-I1 ON 11/18/25. CONTRACTOR WITHDRAWAL

  • Construction

    Issued Apr 29, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #310103553 ON 8/19/2020 DUE TO CONTRACTOR WITHDRAWAL

  • Construction

    Issued Aug 20, 2020 — STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE

  • 26 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3327711. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 16 alteration filing. Its latest status categories are 1 under review, 14 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 22, 2019
Latest recorded change
Sep 29, 2026
Highest proposed story count
10 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 451 Clarkson Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. Filing B00157495-I1.

    01
  2. Alteration approved

    Filing B00157495-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00157495-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Acid/bicarbonate distribution piping and drainage. Filing B00274736-I1.

    04
  5. Alteration approved

    Filing B00274736-I1 reached an approved status.

    05
  6. Alteration filed

    Installation of a new kitchen sink, cooler-water supply a refrigerator drainage line. Filing B00306288-I1.

    06
  7. Alteration approved

    Filing B00306288-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00306288-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration now approved

    The latest status recorded for B00157495-I1 is “Permit Entire.”

    09
  10. Alteration now approved

    The latest status recorded for B00274736-I1 is “Approved.”

    010
  11. Alteration now approved

    The latest status recorded for B00306288-I1 is “Permit Entire.”

    011
  12. Alteration filed

    Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope. Filing B00458087-I1.

    012
  13. Alteration approved

    Filing B00458087-I1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for B00458087-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope. Filing B00458087-P1.

    015
  16. Alteration approved

    Filing B00458087-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00458087-P1 is “Approved.”

    017
  18. Alteration filed

    Kings County Hospital Center :Building A & C: install UV lights or PCO to reduce virus particles & disinfect the cooling coils; install or replace existing humidifiers, convert filters to electronic . See comments for PAA scope. Filing B00458087-P2.

    018
  19. Alteration approved

    Filing B00458087-P2 reached an approved status.

    019
  20. Alteration now approved

    The latest status recorded for B00458087-P2 is “Approved.”

    020
  21. Alteration filed

    Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-I1.

    021
  22. Alteration filed

    Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy. Filing B00621025-I1.

    022
  23. Alteration filed

    Remove/ replace sprinklers with new heads and piping; install temporary sprinkler protection as per plans. Remove plumbing fixtures and install newon 2nd flor. install med medical gas piping cellar through 2nd floor. Filing B00621114-I1.

    023
  24. Alteration approved

    Filing B00621060-I1 reached an approved status.

    024
  25. Alteration approved

    Filing B00621114-I1 reached an approved status.

    025
  26. Alteration approved

    Filing B00621025-I1 reached an approved status.

    026
  27. Alteration signed off

    DOB recorded a sign-off for B00458087-I1.

    027
  28. Alteration now completed

    The latest status recorded for B00458087-I1 is “LOC Issued.”

    028
  29. Alteration filed

    Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-P1.

    029
  30. Alteration filed

    Remove and install new ductwork, AHU and chiller as per plans filed herewith for the O.R. on partial 2nd floor, C Building, in the existing hospital as per plans filed herewith. Filing B00621071-I1.

    030
  31. Alteration approved

    Filing B00621071-I1 reached an approved status.

    031
  32. Alteration approved

    Filing B00621060-P1 reached an approved status.

    032
  33. Alteration now approved

    The latest status recorded for B00621060-P1 is “Approved.”

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for B00621060-I1. That is not by itself confirmation of activity on site.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for B00621071-I1. That is not by itself confirmation of activity on site.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for B00621025-I1. That is not by itself confirmation of activity on site.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for B00621114-I1. That is not by itself confirmation of activity on site.

    037
  38. Alteration filed

    Removal and installation of interior non-bearing partitions, and related finishes as per drawings filed herewith. no change to egress, occupancy or use. Filing B01191852-I1.

    038
  39. Alteration filed

    Kings county hospital center - ed expansion - mechanical modifications as per plans filed herewith. no change in use egress, or occupancy. Filing B01191852-S3.

    039
  40. Alteration approved

    Filing B01191852-I1 reached an approved status.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for B01191852-I1. That is not by itself confirmation of activity on site.

    041
  42. Alteration approved

    Filing B01191852-S3 reached an approved status.

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for B01191852-S3. That is not by itself confirmation of activity on site.

    043
  44. Alteration now approved

    The latest status recorded for B00621071-I1 is “Permit Entire.”

    044
  45. Alteration filed

    Remove and install new partitions and finishes for O.R. renovation on partial 2nd as indicated on plans filed herewith only. Work involves no change to zoning, use, egerss, or occupancy. Filing B00621025-P1.

    045
  46. Alteration filed

    Structural work including new steel to accommodate hospital Cath Lab renovation on partial 2nd floor in the existing hospital, and install new steel dunnage and modification to existing dunnage to support MEP equipment 1st floor roof. Filing B00621060-P2.

    046
  47. Alteration now approved

    The latest status recorded for B00621025-I1 is “Permit Entire.”

    047
  48. Alteration approved

    Filing B00621025-P1 reached an approved status.

    048
  49. Alteration now approved

    The latest status recorded for B00621025-P1 is “Approved.”

    049
  50. Alteration now approved

    The latest status recorded for B00621060-I1 is “Permit Entire.”

    050
  51. Alteration approved

    Filing B00621060-P2 reached an approved status.

    051
  52. Alteration now approved

    The latest status recorded for B00621060-P2 is “Approved.”

    052
  53. Alteration filed

    Construct new footing to accomodate HVAC equipment on the roof. (Refer to B00621071-I1 for mechanical equipment.). Filing B00621060-S1.

    053
  54. Alteration now approved

    The latest status recorded for B01191852-S3 is “Permit Entire.”

    054
  55. Alteration now approved

    The latest status recorded for B01191852-I1 is “Permit Entire.”

    055
  56. Alteration now approved

    The latest status recorded for B00621114-I1 is “Permit Entire.”

    056
  57. Alteration now under review

    The latest status recorded for B00621060-S1 is “Plan Examiner Review.”

    057