Building record · BIN 3327832

295 Jackson Street

295 Jackson Street, Brooklyn, NY 11211

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 20 independently sourced records, including 20 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3327832

295 Jackson Street

East Williamsburg, Brooklyn

A consolidated public-record view · updated Sep 22, 2026

DOB filings
20
Active-status
20
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings20
Open or active-status records20
First included filingJan 21, 2021
Latest recorded changeSep 22, 2026

The lot

What is already here?

The lot holds a 8-story elevator apartment building built in 1950, with 700 homes, on a 510,960 sq ft lot.

  1. Floor 8Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 21.1 m. Nothing on that side reaches this floor.
  2. Floors 2–7Homes700 homes are recorded on this lot — about 100 homes to a floor. The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes700 recorded on the lot
  • Above the southern skylineFrom about floor 8 — the tallest thing within 60 m to the south is 21.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 21 m over 8 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1950
Floors
8
Residential units
700
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
510,960 sq ft
Building area
611,340 sq ft

Housing violations

11 violations are open against this address under the Housing Maintenance Code. 7 of them are the class the city calls immediately hazardous.

  • 7Immediately hazardous
  • 4Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 16 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3327832. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 alteration filing. Its latest status categories are 19 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 21, 2021
Latest recorded change
Sep 22, 2026
Highest proposed story count
7 stories
Highest proposed unit count
112 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 295 Jackson Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 20 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Building 11-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00447246-I1.

    01
  2. Alteration filed

    Building 11-MH-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. All as per plans filed herewith. Filing B00447308-I1.

    02
  3. Alteration approved

    Filing B00447308-I1 reached an approved status.

    03
  4. Alteration filed

    Building 11-provide loose lintel for louver opening on masonry wall; repair concrete pad; provide boiler access platform; provide outdoor enclosure support framing. Filing B00447308-S1.

    04
  5. Alteration approved

    Filing B00447308-S1 reached an approved status.

    05
  6. Alteration filed

    Bldg 11 - Proposed Boiler application filed to replace 3 existing dual fuel boilers (Oil/Gas) with new GAS boiler. Boiler #4 will be removed as per plans. Original filing does not allow us to update the energy source of existing or of NEW boilers. Filing B00447355-I1.

    06
  7. Alteration approved

    Filing B00447355-I1 reached an approved status.

    07
  8. Alteration approved

    Filing B00447246-I1 reached an approved status.

    08
  9. Alteration filed

    NYCHA Boiler - Building 11 - Civil General Construction work to include underground fuel oil tank removal. All as per plans filed herewith. Filing B00447308-S3.

    09
  10. Alteration filed

    NYCHA Boiler - Building 11 - Civil PL- Natural Gas piping will be run above-ground from gas meter enclosure and domestic hot water heater rooms. Filing B00447308-S2.

    010
  11. Alteration approved

    Filing B00447308-S3 reached an approved status.

    011
  12. Alteration approved

    Filing B00447308-S2 reached an approved status.

    012
  13. Alteration filed

    NYCHA BLDG #11- Architectural work being filed in conjunction with Cooper Houses and all related applications. All as per plans filed herewith. Filing B00447308-S4.

    013
  14. Alteration approved

    Filing B00447308-S4 reached an approved status.

    014
  15. Alteration filed

    Building 11-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00447308-P1.

    015
  16. Alteration approved

    Filing B00447308-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B00447308-P1 is “Approved.”

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for B00447308-S4. That is not by itself confirmation of activity on site.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for B00447308-S1. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for B00447308-S3. That is not by itself confirmation of activity on site.

    020
  21. Alteration filed

    Building 11-Demolition of existing hot water tank, cold & hot water supply/return to the tank. Install new gas water heaters, expansion tank, hot water recirculation pumps & associated valves in tank/boiler room. Install temporary water heaters. Filing B00447246-P1.

    021
  22. Alteration approved

    Filing B00447246-P1 reached an approved status.

    022
  23. Alteration now approved

    The latest status recorded for B00447246-P1 is “Approved.”

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00447246-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Building 11-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00447308-P2.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00447308-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration approved

    Filing B00447308-P2 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00447308-P2 is “Approved.”

    028
  29. Alteration filed

    Building 11-MH-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. All as per plans filed herewith. Filing B00447308-P5.

    029
  30. Alteration filed

    Building 11-Removal of existing hot water tank, cold & hot water supply/return to the tank. Install new gas water heaters, expansion tank, hot water re-circulation pumps & associated valves in tank/boiler room. Install temporary water heaters. Filing B00447246-P2.

    030
  31. Alteration filed

    NYCHA Boiler - Building 11 - Civil PL- Natural Gas piping will be run above-ground from gas meter enclosure and domestic hot water heater rooms. Filing B00447308-P4.

    031
  32. Alteration filed

    NYCHA Boiler - Building 11 - Civil General Construction work to include underground fuel oil tank removal. All as per plans filed herewith. Filing B00447308-P3.

    032
  33. Alteration now approved

    The latest status recorded for B00447355-I1 is “Approved.”

    033
  34. Alteration filed

    Bldg 11 - Proposed Boiler application filed to replace 3 existing dual fuel boilers (Oil/Gas) with new GAS boiler. Boiler #4 will be removed as per plans. Original filing does not allow us to update the energy source of existing or of NEW boilers. Filing B00447355-P1.

    034
  35. Alteration approved

    Filing B00447355-P1 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for B00447355-P1 is “Approved.”

    036
  37. Alteration approved

    Filing B00447308-P5 reached an approved status.

    037
  38. Alteration now approved

    The latest status recorded for B00447308-P5 is “Approved.”

    038
  39. Alteration approved

    Filing B00447308-P4 reached an approved status.

    039
  40. Alteration now approved

    The latest status recorded for B00447308-P4 is “Approved.”

    040
  41. Alteration approved

    Filing B00447246-P2 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for B00447246-P2 is “Approved.”

    042
  43. Alteration approved

    Filing B00447308-P3 reached an approved status.

    043
  44. Alteration now approved

    The latest status recorded for B00447308-P3 is “Approved.”

    044
  45. Alteration filed

    Building 11-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00447246-P3.

    045
  46. Alteration approved

    Filing B00447246-P3 reached an approved status.

    046
  47. Alteration now approved

    The latest status recorded for B00447246-P3 is “Approved.”

    047
  48. Alteration filed

    NYCHA BLDG #11- Architectural work being filed in conjunction with Cooper Houses and all related applications. All as per plans filed herewith. Filing B00447308-P6.

    048
  49. Alteration approved

    Filing B00447308-P6 reached an approved status.

    049
  50. Alteration now approved

    The latest status recorded for B00447308-P6 is “Approved.”

    050
  51. Alteration filed

    NYCHA BLDG #11- Architectural work being filed in conjunction with Cooper Houses and all related applications. All as per plans filed herewith. Filing B00447308-P7.

    051
  52. Alteration approved

    Filing B00447308-P7 reached an approved status.

    052
  53. Alteration now approved

    The latest status recorded for B00447308-P7 is “Approved.”

    053
  54. Alteration filed

    Building 11-provide loose lintel for louver opening on masonry wall; repair concrete pad; provide boiler access platform; provide outdoor enclosure support framing. Filing B00447308-P8.

    054
  55. Alteration approved

    Filing B00447308-P8 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for B00447308-P8 is “Approved.”

    056
  57. Alteration now approved

    The latest status recorded for B00447246-I1 is “Permit Entire.”

    057
  58. Alteration now approved

    The latest status recorded for B00447308-I1 is “Permit Entire.”

    058
  59. Alteration now approved

    The latest status recorded for B00447308-S1 is “Permit Entire.”

    059
  60. Alteration now approved

    The latest status recorded for B00447308-S4 is “Permit Entire.”

    060
  61. Alteration filed

    Building 11-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00447246-P4.

    061
  62. Alteration now under review

    The latest status recorded for B00447246-P4 is “Objections.”

    062
  63. Alteration now approved

    The latest status recorded for B00447308-S3 is “Permit Entire.”

    063
  64. Alteration now approved

    The latest status recorded for B00447308-S2 is “Approved.”

    064