Building record · BIN 3329825

135 Emerson Place

135 Emerson Place, Brooklyn, NY 11205

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3329825

135 Emerson Place

Clinton Hill, Brooklyn

A consolidated public-record view · updated Jan 20, 2026

DOB filings
13
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings13
Open or active-status records8
First included filingFeb 5, 2018
Latest recorded changeJan 20, 2026

The lot

What is already here?

The lot holds a 10-story hotel built in 2018, on a 34,700 sq ft lot.

Built
2018
Floors
10
Residential units
0
Building type
Hotel
Land use
Public facilities and institutions
Zoning district
R6
Lot area
34,700 sq ft
Building area
66,093 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 18 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3329825. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 13 alteration filing. Its latest status categories are 5 recorded as completed, 8 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 5, 2018
Latest recorded change
Jan 20, 2026
Highest proposed story count
Not stated
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 135 Emerson Place.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of scaffold during nb construction as per plans. work shall comply with 2014 building code chapter 33. no change in usb, egress or occupancy. Filing B00016690-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00016690-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00067774-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00067774-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of temporary (60'-130') high pipe scaffold at various levels for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code.heavy duty sidewalk shed filed under separate application. Filing B00092213-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00092213-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of temporary (60'-130') high pipe scaffold at various levels for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code.heavy duty sidewalk shed filed under separate application. Filing B00092213-P1.

    07
  8. Alteration approved

    Filing B00092213-P1 reached an approved status.

    08
  9. Alteration filed

    Installation of a temporary scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00116496-I1.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B00116496-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Installation of a temporary scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00116496-P1.

    011
  12. Alteration approved

    Filing B00116496-P1 reached an approved status.

    012
  13. Alteration filed

    Installation of a temporary scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00116496-P2.

    013
  14. Alteration approved

    Filing B00116496-P2 reached an approved status.

    014
  15. Alteration filed

    Installation of a temporary scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00116496-P3.

    015
  16. Alteration approved

    Filing B00116496-P3 reached an approved status.

    016
  17. Alteration filed

    Installation of temporary 14' high working platform originating (off building floors)for new building construction work as per plan. no change in use egress or occupancy,working platform shall comply 2014 the ny building code. Filing B00173025-I1.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for B00173025-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Installation of temporary 14' high working platform originating (off building floors)for new building construction work as per plan. no change in use egress or occupancy,working platform shall comply 2014 the ny building code. Filing B00173025-P1.

    019
  20. Alteration approved

    Filing B00173025-P1 reached an approved status.

    020
  21. Alteration filed

    Installation of temporary (60'-130') high pipe scaffold at various levels for facade repair work as per plan. no change in use egress or occupancy,pipe scaffold shall comply with chapter#33 of 2014 the ny building code.heavy duty sidewalk shed filed under separate application. Filing B00092213-P2.

    021
  22. Alteration approved

    Filing B00092213-P2 reached an approved status.

    022
  23. Alteration filed

    Installation of a temporary scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00116496-P4.

    023
  24. Alteration approved

    Filing B00116496-P4 reached an approved status.

    024
  25. Alteration filed

    Installation of a temporary scaffold as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold to comply with chapter 33 of NYC building code of 2014. Filing B00116496-P5.

    025
  26. Alteration approved

    Filing B00116496-P5 reached an approved status.

    026
  27. Alteration signed off

    DOB recorded a sign-off for B00173025-I1.

    027
  28. Alteration signed off

    DOB recorded a sign-off for B00067774-I1.

    028
  29. Alteration signed off

    DOB recorded a sign-off for B00092213-I1.

    029
  30. Alteration signed off

    DOB recorded a sign-off for B00016690-I1.

    030
  31. Alteration now approved

    The latest status recorded for B00092213-P2 is “Approved.”

    031
  32. Alteration now approved

    The latest status recorded for B00116496-P4 is “Approved.”

    032
  33. Alteration now approved

    The latest status recorded for B00116496-P5 is “Approved.”

    033
  34. Alteration now completed

    The latest status recorded for B00173025-I1 is “LOC Issued.”

    034
  35. Alteration now approved

    The latest status recorded for B00173025-P1 is “Approved.”

    035
  36. Alteration now completed

    The latest status recorded for B00016690-I1 is “LOC Issued.”

    036
  37. Alteration now completed

    The latest status recorded for B00067774-I1 is “LOC Issued.”

    037
  38. Alteration now completed

    The latest status recorded for B00092213-I1 is “LOC Issued.”

    038
  39. Alteration now approved

    The latest status recorded for B00092213-P1 is “Approved.”

    039
  40. Alteration now approved

    The latest status recorded for B00116496-P1 is “Approved.”

    040
  41. Alteration now approved

    The latest status recorded for B00116496-P2 is “Approved.”

    041
  42. Alteration now approved

    The latest status recorded for B00116496-P3 is “Approved.”

    042
  43. Alteration signed off

    DOB recorded a sign-off for B00116496-I1.

    043
  44. Alteration now completed

    The latest status recorded for B00116496-I1 is “LOC Issued.”

    044