Building record · BIN 3330564

195 South 4 Street

195 South 4 Street, Brooklyn, NY 11211

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3330564

195 South 4 Street

Williamsburg, Brooklyn

A consolidated public-record view · updated May 14, 2021

DOB filings
4
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records1
First included filingFeb 3, 2020
Latest recorded changeMay 14, 2021

The lot

What is already here?

The lot holds a 5-story walk-up apartment building built in 1920, with 35 homes, on a 5,130 sq ft lot.

Built
1920
Floors
5
Residential units
35
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
5,130 sq ft
Building area
23,355 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3330564. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 3, 2020
Latest recorded change
May 14, 2021
Highest proposed story count
Not stated
Highest proposed unit count
35 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 195 South 4 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Removal of existing gas main piping, gas riser piping. gas risers and meters throughout. Installation of new gas main piping, gas distribution piping, new common risers and twinset gas master meter. Filing B00206365-I1.

    01
  2. Alteration approved

    Filing B00206365-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00206365-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Installing new ductless mini split-unit on first floor at apartment a3.1) one new outdoor air handling unit at courtyard 2) one new indoor head unit at bedrooms & one new indoor head unit at living room. no change to use, egress or occupancy. Filing B00356923-I1.

    04
  5. Alteration filed

    Fiing to remove/cap existing bathtub in bathroom, new shower stall in bathroom, relocate lavatory in bathroom, replace water-closet in bathroom, replace kitchen sink, new electric washer & electric dryer in kitchen. no change to use egress occupancy. Filing B00356983-I1.

    05
  6. Alteration approved

    Filing B00356983-I1 reached an approved status.

    06
  7. Alteration approved

    Filing B00356923-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00356983-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00356923-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration signed off

    DOB recorded a sign-off for B00356983-I1.

    010
  11. Alteration now completed

    The latest status recorded for B00356983-I1 is “LOC Issued.”

    011
  12. Alteration signed off

    DOB recorded a sign-off for B00356923-I1.

    012
  13. Alteration now completed

    The latest status recorded for B00356923-I1 is “LOC Issued.”

    013
  14. Alteration filed

    Removal of existing gas main piping, gas riser piping. gas risers and meters throughout. Installation of new gas main piping, gas distribution piping, new common risers and twinset gas master meter. Filing B00206365-P1.

    014
  15. Alteration approved

    Filing B00206365-P1 reached an approved status.

    015
  16. Alteration now approved

    The latest status recorded for B00206365-P1 is “Approved.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for B00206365-I1.

    017
  18. Alteration now completed

    The latest status recorded for B00206365-I1 is “LOC Issued.”

    018