DOB filing B00396925-I1
Alteration filing at 334 21 Street
Building record · BIN 3332166
334 21 Street, Brooklyn, NY 11215
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3332166
334 21 Street
Sunset Park (West), Brooklyn
A consolidated public-record view · updated Feb 28, 2023
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3332166. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 7 recorded as completed, 5 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 334 21 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Alteration type 3- construction equipment fence installation pf plywood fence as per plan. no change in use, occupancy, or egress under this application. Filing B00294357-I1.
Filing B00294357-I1 reached an approved status.
Proposed mechanical design for new 4 story , 4 apartments building in conjunction with nb application 321594878. Filing B00215433-I1.
Filing B00215433-I1 reached an approved status.
DOB lists a first permit date for B00294357-I1. That is not by itself confirmation of activity on site.
Alteration type 3- construction equipment fence installation pf plywood fence as per plan. no change in use, occupancy, or egress under this application. Filing B00294357-P1.
Filing B00294357-P1 reached an approved status.
Plumbing system for new 4 story building. Filing B00396925-I1.
Sprinkler application filed in conjunction with NB application. Filing B00396958-I1.
Structural design for new 4 story building. Filing B00214785-I1.
Filing B00396958-I1 reached an approved status.
Filing B00214785-I1 reached an approved status.
Filing B00396925-I1 reached an approved status.
Proposed mechanical design for new 4 story , 4 apartments building in conjunction with nb application 321594878. Filing B00215433-P1.
Filing B00215433-P1 reached an approved status.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing B00431151-I1.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00431170-I1.
DOB lists a first permit date for B00431170-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00431151-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B00215433-P1 is “Approved.”
The latest status recorded for B00294357-P1 is “Approved.”
DOB lists a first permit date for B00396925-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00396958-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00431170-P1.
Filing B00431170-P1 reached an approved status.
The latest status recorded for B00431170-P1 is “Approved.”
DOB lists a first permit date for B00215433-I1. That is not by itself confirmation of activity on site.
Plumbing system for new 4 story building. Filing B00396925-P1.
Filing B00396925-P1 reached an approved status.
The latest status recorded for B00396925-P1 is “Approved.”
DOB lists a first permit date for B00214785-I1. That is not by itself confirmation of activity on site.
Sprinkler application filed in conjunction with NB application. Filing B00396958-P1.
DOB recorded a sign-off for B00431151-I1.
The latest status recorded for B00431151-I1 is “LOC Issued.”
DOB recorded a sign-off for B00431170-I1.
The latest status recorded for B00431170-I1 is “LOC Issued.”
DOB recorded a sign-off for B00294357-I1.
The latest status recorded for B00294357-I1 is “LOC Issued.”
DOB recorded a sign-off for B00214785-I1.
The latest status recorded for B00214785-I1 is “LOC Issued.”
Filing B00396958-P1 reached an approved status.
The latest status recorded for B00396958-P1 is “Approved.”
DOB recorded a sign-off for B00215433-I1.
The latest status recorded for B00215433-I1 is “LOC Issued.”
DOB recorded a sign-off for B00396925-I1.
The latest status recorded for B00396925-I1 is “LOC Issued.”
DOB recorded a sign-off for B00396958-I1.
The latest status recorded for B00396958-I1 is “LOC Issued.”