Building record · BIN 3332782

275 Jackson Street

275 Jackson Street, Brooklyn, NY 11211

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 19 independently sourced records, including 19 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3332782

275 Jackson Street

East Williamsburg, Brooklyn

A consolidated public-record view · updated Sep 22, 2026

DOB filings
19
Active-status
19
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings19
Open or active-status records19
First included filingJan 27, 2021
Latest recorded changeSep 22, 2026

The lot

What is already here?

The lot holds a 8-story elevator apartment building built in 1950, with 700 homes, on a 510,960 sq ft lot.

  1. Floors 2–8Homes700 homes are recorded on this lot — about 100 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes700 recorded on the lot
  • Above the southern skylineFrom about floor 11 — the tallest thing within 60 m to the south is 31.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 20.5 m over 8 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1950
Floors
8
Residential units
700
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
510,960 sq ft
Building area
611,340 sq ft

Housing violations

11 violations are open against this address under the Housing Maintenance Code. 7 of them are the class the city calls immediately hazardous.

  • 7Immediately hazardous
  • 4Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 8 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3332782. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 19 alteration filing. Its latest status categories are 19 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 27, 2021
Latest recorded change
Sep 22, 2026
Highest proposed story count
7 stories
Highest proposed unit count
56 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 275 Jackson Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00443515-I1.

    01
  2. Alteration filed

    B1-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00443555-I1.

    02
  3. Alteration approved

    Filing B00443515-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B00443555-I1 reached an approved status.

    04
  5. Alteration filed

    Provide loose lintel for louver opening on masonry wall repair and extend ex.concrete pad. provide boiler access platform & provide outdoor flue support. Filing B00443515-S1.

    05
  6. Alteration approved

    Filing B00443515-S1 reached an approved status.

    06
  7. Alteration filed

    Bldg. 1:Demolition of exist. HW tank, cold water supply & HW supply/return to the tank .Install new gas WH, HW recirculation pumps &associated valves in tank room; new gas piping to HWH; new HW & cold water supply/return piping to HWH; temporary HWH. Filing B00443555-P1.

    07
  8. Alteration approved

    Filing B00443555-P1 reached an approved status.

    08
  9. Alteration now approved

    The latest status recorded for B00443555-P1 is “Approved.”

    09
  10. Alteration filed

    NYCHA Boiler Building # 1: Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms. Filing B00443515-S2.

    010
  11. Alteration filed

    NYCHA Boiler Building # 1: General Construction work will include trenching excavation, backfill, repair of concrete walkways. Filing B00443515-S3.

    011
  12. Alteration approved

    Filing B00443515-S2 reached an approved status.

    012
  13. Alteration approved

    Filing B00443515-S3 reached an approved status.

    013
  14. Alteration filed

    NYCHA BOILER- BLDG # 1- Architectural work being filed in conjunction with Cooper Houses and all related applications. Filing B00443515-S4.

    014
  15. Alteration approved

    Filing B00443515-S4 reached an approved status.

    015
  16. Alteration filed

    Provide loose lintel for louver opening on masonry wall repair and extend ex.concrete pad. provide boiler access platform & provide outdoor flue support. Filing B00443515-P3.

    016
  17. Alteration approved

    Filing B00443515-P3 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00443515-P3 is “Approved.”

    018
  19. Alteration filed

    Bldg. 1:Demolition of exist. HW tank, cold water supply & HW supply/return to the tank .Install new gas WH, HW recirculation pumps &associated valves in tank room; new gas piping to HWH; new HW & cold water supply/return piping to HWH; temporary HWH. Filing B00443555-P2.

    019
  20. Alteration filed

    NYCHA Boiler Building # 1: General Construction work will include trenching excavation, backfill, repair of concrete walkways. Filing B00443515-P1.

    020
  21. Alteration filed

    NYCHA Boiler Building # 1: Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms. Filing B00443515-P4.

    021
  22. Alteration filed

    Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00443515-P2.

    022
  23. Alteration approved

    Filing B00443515-P1 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for B00443515-P1 is “Approved.”

    024
  25. Alteration approved

    Filing B00443515-P4 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00443515-P4 is “Approved.”

    026
  27. Alteration approved

    Filing B00443515-P2 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00443515-P2 is “Approved.”

    028
  29. Alteration filed

    NYCHA BOILER- BLDG # 1- Architectural work being filed in conjunction with Cooper Houses and all related applications. Filing B00443515-P5.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for B00443515-S1. That is not by itself confirmation of activity on site.

    030
  31. Alteration approved

    Filing B00443515-P5 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for B00443515-P5 is “Approved.”

    032
  33. Alteration approved

    Filing B00443555-P2 reached an approved status.

    033
  34. Alteration now approved

    The latest status recorded for B00443555-P2 is “Approved.”

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for B00443515-S2. That is not by itself confirmation of activity on site.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for B00443515-S4. That is not by itself confirmation of activity on site.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for B00443515-S3. That is not by itself confirmation of activity on site.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for B00443515-I1. That is not by itself confirmation of activity on site.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for B00443555-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration filed

    NYCHA BOILER- BLDG # 1- Architectural work being filed in conjunction with Cooper Houses and all related applications. Filing B00443515-P6.

    040
  41. Alteration filed

    B1-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00443555-P3.

    041
  42. Alteration approved

    Filing B00443555-P3 reached an approved status.

    042
  43. Alteration now approved

    The latest status recorded for B00443555-P3 is “Approved.”

    043
  44. Alteration approved

    Filing B00443515-P6 reached an approved status.

    044
  45. Alteration now approved

    The latest status recorded for B00443515-P6 is “Approved.”

    045
  46. Alteration filed

    NYCHA BOILER- BLDG # 1- Architectural work being filed in conjunction with Cooper Houses and all related applications. Filing B00443515-P7.

    046
  47. Alteration approved

    Filing B00443515-P7 reached an approved status.

    047
  48. Alteration now approved

    The latest status recorded for B00443515-P7 is “Approved.”

    048
  49. Alteration filed

    Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00443515-P8.

    049
  50. Alteration approved

    Filing B00443515-P8 reached an approved status.

    050
  51. Alteration now approved

    The latest status recorded for B00443515-P8 is “Approved.”

    051
  52. Alteration filed

    B1-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00443555-P4.

    052
  53. Alteration now approved

    The latest status recorded for B00443515-S1 is “Permit Entire.”

    053
  54. Alteration now approved

    The latest status recorded for B00443555-I1 is “Permit Entire.”

    054
  55. Alteration approved

    Filing B00443555-P4 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for B00443555-P4 is “Approved.”

    056
  57. Alteration filed

    Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00443515-P9.

    057
  58. Alteration now approved

    The latest status recorded for B00443515-I1 is “Permit Entire.”

    058
  59. Alteration approved

    Filing B00443515-P9 reached an approved status.

    059
  60. Alteration now approved

    The latest status recorded for B00443515-P9 is “Approved.”

    060
  61. Alteration now approved

    The latest status recorded for B00443515-S4 is “Permit Entire.”

    061
  62. Alteration now approved

    The latest status recorded for B00443515-S2 is “Permit Entire.”

    062
  63. Alteration now approved

    The latest status recorded for B00443515-S3 is “Permit Entire.”

    063