Building record · BIN 3332784

389 Morgan Avenue

389 Morgan Avenue, Brooklyn, NY 11211

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 15 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3332784

389 Morgan Avenue

East Williamsburg, Brooklyn

A consolidated public-record view · updated Jun 15, 2026

DOB filings
15
Active-status
15
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings15
Open or active-status records15
First included filingJan 21, 2021
Latest recorded changeJun 15, 2026

The lot

What is already here?

The lot holds a 8-story elevator apartment building built in 1950, with 700 homes, on a 510,960 sq ft lot.

  1. Floor 8Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 21.1 m. Nothing on that side reaches this floor.
  2. Floors 2–7Homes700 homes are recorded on this lot — about 100 homes to a floor. The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes700 recorded on the lot
  • Above the southern skylineFrom about floor 8 — the tallest thing within 60 m to the south is 21.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 21.4 m over 8 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1950
Floors
8
Residential units
700
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
510,960 sq ft
Building area
611,340 sq ft

Housing violations

11 violations are open against this address under the Housing Maintenance Code. 7 of them are the class the city calls immediately hazardous.

  • 7Immediately hazardous
  • 4Hazardous
  • 0Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 10 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3332784. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 15 alteration filing. Its latest status categories are 15 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 21, 2021
Latest recorded change
Jun 15, 2026
Highest proposed story count
7 stories
Highest proposed unit count
112 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 389 Morgan Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 15 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Building 8-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00443443-I1.

    01
  2. Alteration filed

    Building 8-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00444118-I1.

    02
  3. Alteration filed

    Building #8 - proposed structural work. all as per plans filed herewith. Filing B00443443-S1.

    03
  4. Alteration approved

    Filing B00444118-I1 reached an approved status.

    04
  5. Alteration filed

    NYCHA Boiler-Building 8-Natural Gas piping will be run underground from the gas meter room and domestic hot water heater rooms. Filing B00443443-S2.

    05
  6. Alteration filed

    NYCHA Boiler BLDG #8-Civil construction will include trenching excavation, backfill, repair of concrete walkways. Filing B00443443-S3.

    06
  7. Alteration approved

    Filing B00443443-S1 reached an approved status.

    07
  8. Alteration approved

    Filing B00443443-I1 reached an approved status.

    08
  9. Alteration approved

    Filing B00443443-S2 reached an approved status.

    09
  10. Alteration approved

    Filing B00443443-S3 reached an approved status.

    010
  11. Alteration filed

    NYCHA Boiler - BLDG # 8 -Architectural work being filed in conjunction with Cooper Houses and all related applications. All as per plans filed herewith. No change to use, egress or occupancy. Filing B00443443-S4.

    011
  12. Alteration approved

    Filing B00443443-S4 reached an approved status.

    012
  13. Alteration filed

    Building 8-Demolition of existing hot water tank, cold water supply and hot water supply/return to the tank. Install new gas water heaters, expansion tank, hot water recirculation pumps and associated valves in tank room. Install new gas piping to new wh. Filing B00444118-P1.

    013
  14. Alteration filed

    NYCHA Boiler BLDG #8-Civil construction will include trenching excavation, backfill, repair of concrete walkways. Filing B00443443-P2.

    014
  15. Alteration filed

    NYCHA Boiler-Building 8-Natural Gas piping will be run underground from the gas meter room and domestic hot water heater rooms. Filing B00443443-P3.

    015
  16. Alteration filed

    Building #8 - proposed structural work. all as per plans filed herewith. Filing B00443443-P4.

    016
  17. Alteration filed

    Building 8-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters. Filing B00443443-P5.

    017
  18. Alteration approved

    Filing B00443443-P5 reached an approved status.

    018
  19. Alteration now approved

    The latest status recorded for B00443443-P5 is “Approved.”

    019
  20. Alteration approved

    Filing B00443443-P4 reached an approved status.

    020
  21. Alteration now approved

    The latest status recorded for B00443443-P4 is “Approved.”

    021
  22. Alteration approved

    Filing B00443443-P2 reached an approved status.

    022
  23. Alteration now approved

    The latest status recorded for B00443443-P2 is “Approved.”

    023
  24. Alteration approved

    Filing B00443443-P3 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for B00443443-P3 is “Approved.”

    025
  26. Alteration filed

    NYCHA Boiler - BLDG # 8 -Architectural work being filed in conjunction with Cooper Houses and all related applications. All as per plans filed herewith. No change to use, egress or occupancy. Filing B00443443-P1.

    026
  27. Alteration approved

    Filing B00443443-P1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for B00443443-P1 is “Approved.”

    028
  29. Alteration now approved

    The latest status recorded for B00443443-S3 is “Approved.”

    029
  30. Alteration approved

    Filing B00444118-P1 reached an approved status.

    030
  31. Alteration now approved

    The latest status recorded for B00444118-P1 is “Approved.”

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for B00443443-S2. That is not by itself confirmation of activity on site.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for B00443443-S4. That is not by itself confirmation of activity on site.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for B00443443-S1. That is not by itself confirmation of activity on site.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for B00443443-I1. That is not by itself confirmation of activity on site.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for B00444118-I1. That is not by itself confirmation of activity on site.

    036
  37. Alteration filed

    NYCHA Boiler - BLDG # 8 -Architectural work being filed in conjunction with Cooper Houses and all related applications. All as per plans filed herewith. No change to use, egress or occupancy. Filing B00443443-P6.

    037
  38. Alteration filed

    Building 8-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00444118-P2.

    038
  39. Alteration approved

    Filing B00444118-P2 reached an approved status.

    039
  40. Alteration now approved

    The latest status recorded for B00444118-P2 is “Approved.”

    040
  41. Alteration approved

    Filing B00443443-P6 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for B00443443-P6 is “Approved.”

    042
  43. Alteration filed

    Building 8-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans. Filing B00444118-P3.

    043
  44. Alteration now approved

    The latest status recorded for B00443443-S2 is “Permit Entire.”

    044
  45. Alteration approved

    Filing B00444118-P3 reached an approved status.

    045
  46. Alteration now approved

    The latest status recorded for B00444118-P3 is “Approved.”

    046
  47. Alteration now approved

    The latest status recorded for B00443443-S1 is “Permit Entire.”

    047
  48. Alteration now approved

    The latest status recorded for B00443443-I1 is “Permit Entire.”

    048
  49. Alteration now approved

    The latest status recorded for B00444118-I1 is “Permit Entire.”

    049
  50. Alteration now approved

    The latest status recorded for B00443443-S4 is “Permit Entire.”

    050