DOB filing B01204683-I1
Alteration filing at 128 Clymer Street
Building record · BIN 3334991
128 Clymer Street, Brooklyn, NY 11249
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 15 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3334991
128 Clymer Street
South Williamsburg, Brooklyn
A consolidated public-record view · updated Sep 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 21-story elevator apartment building built in 1963, with 372 homes, on a 116,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3334991. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 15 alteration filing. Its latest status categories are 11 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 128 Clymer Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 15 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filing herewith mechanical work as per plans. no change in use, egress, or occupancy. Filing B00298581-I1.
Filing herewith boiler installation as per plans, no change in use, egress, or occupancy. Filing B00310395-I1.
Filing herewith plumbing work as per plans. no change in use, egress,or occupancy. Filing B00296041-I1.
Filing B00296041-I1 reached an approved status.
Filing B00298581-I1 reached an approved status.
Filing B00310395-I1 reached an approved status.
DOB lists a first permit date for B00296041-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00310395-I1. That is not by itself confirmation of activity on site.
Filing herewith plumbing work as per plans. no change in use, egress,or occupancy. Filing B00296041-P1.
Filing B00296041-P1 reached an approved status.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy. Filing B00373730-I1.
Filing B00373730-I1 reached an approved status.
DOB lists a first permit date for B00373730-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for B00298581-I1. That is not by itself confirmation of activity on site.
Plumbing modifications as indicated on drawings filed herewith. no change to use, egress or occupancy. Filing B00411336-I1.
Filing herewith plumbing work as per plans. no change in use, egress,or occupancy. Filing B00296041-P2.
Filing B00296041-P2 reached an approved status.
Filing herewith boiler installation as per plans, no change in use, egress, or occupancy. Filing B00310395-P1.
Filing B00310395-P1 reached an approved status.
Filing B00411336-I1 reached an approved status.
Plumbing modifications as indicated on drawings filed herewith. no change to use, egress or occupancy. Filing B00411336-P1.
Filing B00411336-P1 reached an approved status.
DOB lists a first permit date for B00411336-I1. That is not by itself confirmation of activity on site.
Plumbing modifications as indicated on drawings filed herewith. no change to use, egress or occupancy. Filing B00411336-P2.
Filing B00411336-P2 reached an approved status.
The latest status recorded for B00296041-P1 is “Approved.”
The latest status recorded for B00296041-P2 is “Approved.”
The latest status recorded for B00310395-P1 is “Approved.”
The latest status recorded for B00411336-P1 is “Approved.”
The latest status recorded for B00411336-P2 is “Approved.”
Filing herewith boiler installation as per plans, no change in use, egress, or occupancy. Filing B00310395-P2.
Filing B00310395-P2 reached an approved status.
The latest status recorded for B00310395-P2 is “Approved.”
Filing herewith boiler installation as per plans, no change in use, egress, or occupancy. Filing B00310395-P3.
Filing B00310395-P3 reached an approved status.
The latest status recorded for B00310395-P3 is “Approved.”
DOB recorded a sign-off for B00373730-I1.
The latest status recorded for B00373730-I1 is “LOC Issued.”
Filing herewith mechanical work as per plans. no change in use, egress, or occupancy. Filing B00298581-P1.
Plumbing modifications as indicated on drawings filed herewith. no change to use, egress or occupancy. Filing B00411336-P3.
Filing B00411336-P3 reached an approved status.
The latest status recorded for B00411336-P3 is “Approved.”
Filing B00298581-P1 reached an approved status.
The latest status recorded for B00298581-P1 is “Approved.”
DOB recorded a sign-off for B00310395-I1.
The latest status recorded for B00310395-I1 is “LOC Issued.”
The latest status recorded for B00298581-I1 is “Permit Entire.”
DOB recorded a sign-off for B00296041-I1.
The latest status recorded for B00296041-I1 is “LOC Issued.”
DOB recorded a sign-off for B00411336-I1.
The latest status recorded for B00411336-I1 is “LOC Issued.”
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application. Filing B01204683-I1.
DOB lists a first permit date for B01204683-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01204683-I1 is “Permit Entire.”