Building record · BIN 3335229

78 Monument Walk

78 Monument Walk, Brooklyn, NY 11205

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3335229

78 Monument Walk

Fort Greene, Brooklyn

A consolidated public-record view · updated Jul 25, 2023

DOB filings
4
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records1
First included filingFeb 28, 2020
Latest recorded changeJul 25, 2023

The lot

What is already here?

The lot holds a 6-story elevator apartment building built in 1939, with 600 homes, on a 376,500 sq ft lot.

Built
1939
Last altered
2010
Floors
6
Residential units
600
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
376,500 sq ft
Building area
587,400 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 9 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3335229. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 28, 2020
Latest recorded change
Jul 25, 2023
Highest proposed story count
Not stated
Highest proposed unit count
78 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 78 Monument Walk.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00321129-I1.

    01
  2. Alteration filed

    Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00321137-I1.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00321137-I1. That is not by itself confirmation of activity on site.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for B00321129-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00321140-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for B00321140-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application. Filing B00321140-P1.

    07
  8. Alteration approved

    Filing B00321140-P1 reached an approved status.

    08
  9. Alteration now approved

    The latest status recorded for B00321140-P1 is “Approved.”

    09
  10. Alteration signed off

    DOB recorded a sign-off for B00321129-I1.

    010
  11. Alteration now completed

    The latest status recorded for B00321129-I1 is “LOC Issued.”

    011
  12. Alteration signed off

    DOB recorded a sign-off for B00321137-I1.

    012
  13. Alteration now completed

    The latest status recorded for B00321137-I1 is “LOC Issued.”

    013
  14. Alteration signed off

    DOB recorded a sign-off for B00321140-I1.

    014
  15. Alteration now completed

    The latest status recorded for B00321140-I1 is “LOC Issued.”

    015