DOB filing B00000270-I1
Alteration filing at 220 Newel Street
Building record · BIN 3337671
220 Newel Street, Brooklyn, NY 11222
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3337671
220 Newel Street
Greenpoint, Brooklyn
A consolidated public-record view · updated Dec 28, 2020
A building-level summary of matched filings, active-status records and published identifiers.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3337671. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 220 Newel Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat. Filing B00000270-I1.
Filing B00000270-I1 reached an approved status.
DOB lists a first permit date for B00000270-I1. That is not by itself confirmation of activity on site.
Scope of Work consists of installation of four new gas fired unit heaters connected to two existing service with 1 existing gas meter, 1 new gas meter and new gas piping. No change in use, egress or occupancy. PW1b (Sch B): Fixtures: First Floor 1- Gas Meter, 1- Gas Piping, 4- Gas Furnaces; Risers: 2 Risers on First Floor; Gas Equipment: 2 Modine PDP300 Unit Heaters rated 300,000 BTUH and 2 Modine HD125 Unit Heaters rated 125,000 BTUH. Gas Usage: Heat. Filing B00000270-P1.
Filing B00000270-P1 reached an approved status.
The latest status recorded for B00000270-I1 is “Permit Entire.”
The latest status recorded for B00000270-P1 is “Approved.”