Building record · BIN 3338267

287 Maspeth Avenue

287 Maspeth Avenue, Brooklyn, NY 11211

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3338267

287 Maspeth Avenue

East Williamsburg, Brooklyn

A consolidated public-record view · updated Sep 10, 2026

DOB filings
8
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records6
First included filingFeb 13, 2019
Latest recorded changeSep 10, 2026

The lot

What is already here?

The lot holds a utility property on a 5,137,000 sq ft lot.

Residential units
0
Building type
Utility property
Land use
Transportation and utility
Zoning district
M3-1
Lot area
5,137,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3338267. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 8 alteration filing. Its latest status categories are 5 approved, 1 under review, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 13, 2019
Latest recorded change
Sep 10, 2026
Highest proposed story count
1 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 287 Maspeth Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installtion of temporary construction fence. Filing B00129075-I1.

    01
  2. Alteration approved

    Filing B00129075-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00129075-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Removal and Installation of plumbing fixtures. Filing B00408197-I1.

    04
  5. Alteration approved

    Filing B00408197-I1 reached an approved status.

    05
  6. Alteration filed

    Warehouse: Removal of condensing unit and evaporator along with associated piping. Installation of mechanical systems with related ductwork and dampers. Filing B00405949-I1.

    06
  7. Alteration approved

    Filing B00405949-I1 reached an approved status.

    07
  8. Alteration filed

    Installation of plumbing fixtures. Filing B00405917-I1.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00408197-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration approved

    Filing B00405917-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for B00405917-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00405949-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration now approved

    The latest status recorded for B00405949-I1 is “Permit Entire.”

    013
  14. Alteration now approved

    The latest status recorded for B00405917-I1 is “Permit Entire.”

    014
  15. Alteration signed off

    DOB recorded a sign-off for B00129075-I1.

    015
  16. Alteration now completed

    The latest status recorded for B00129075-I1 is “LOC Issued.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for B00408197-I1.

    017
  18. Alteration now completed

    The latest status recorded for B00408197-I1 is “LOC Issued.”

    018
  19. Alteration filed

    Filing herewith for the installation of a new wet and new dry sprinkler system. No change in use, egress, or occupancy. Filing B01170423-I1.

    019
  20. Alteration approved

    Filing B01170423-I1 reached an approved status.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B01170423-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    Installation of new structural steel dunnage, new 16-inch reinforced concrete piers, and concrete pad extension at exterior grade to support new ACC units. Includes anchorage, welding, bolting, grating, pipe railing, and required special inspections. Filing B01363469-I1.

    022
  23. Alteration approved

    Filing B01363469-I1 reached an approved status.

    023
  24. Alteration filed

    Removal of cng fleet fueling eq & conc. pads. restore asphalt and gravel areas per plans. no change to use, egress or occupancy. per ac 28-105-4-3 NYC administrative code, public utility gas work shown in this app shall be exempt from NYC building permit. Filing B01415104-I1.

    024
  25. Alteration approved

    Filing B01415104-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B01363469-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration now approved

    The latest status recorded for B01363469-I1 is “Permit Entire.”

    027
  28. Alteration filed

    Installation of new structural steel dunnage, new 16-inch reinforced concrete piers, and concrete pad extension at exterior grade to support new ACC units. Includes anchorage, welding, bolting, grating, pipe railing, and required special inspections. Filing B01363469-P1.

    028
  29. Alteration approved

    Filing B01363469-P1 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B01363469-P1 is “Approved.”

    030
  31. Alteration now under review

    The latest status recorded for B01170423-I1 is “On Hold - Special Inspector Withdrew.”

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for B01415104-I1. That is not by itself confirmation of activity on site.

    032
  33. Alteration now approved

    The latest status recorded for B01415104-I1 is “Permit Entire.”

    033