Building record · BIN 3338600

44 Marcus Garvey Boulevard

44 Marcus Garvey Boulevard, Brooklyn, NY 11206

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 11 independently sourced records, including 11 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3338600

44 Marcus Garvey Boulevard

Bedford-Stuyvesant (East), Brooklyn

A consolidated public-record view · updated Oct 29, 2026

DOB filings
11
Active-status
11
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings11
Open or active-status records11
First included filingOct 13, 2021
Latest recorded changeOct 29, 2026

The lot

What is already here?

The lot holds a 12-story elevator apartment building built in 1950, with 514 homes, on a 371,700 sq ft lot.

  1. Floor 12Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 33.1 m. Nothing on that side reaches this floor.
  2. Floors 2–11Homes514 homes are recorded on this lot — about 47 homes to a floor. The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes514 recorded on the lot
  • Above the southern skylineFrom about floor 12 — the tallest thing within 60 m to the south is 33.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 18.5 m over 12 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1950
Floors
12
Residential units
514
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
371,700 sq ft
Building area
429,900 sq ft

Housing violations

9 violations are open against this address under the Housing Maintenance Code.

  • 0Immediately hazardous
  • 4Hazardous
  • 5Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NYC PARKS

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 14 notices on file; the most recent was issued Feb 22, 2022.

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3338600. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 alteration filing. Its latest status categories are 2 under review, 9 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 13, 2021
Latest recorded change
Oct 29, 2026
Highest proposed story count
7 stories
Highest proposed unit count
78 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 44 Marcus Garvey Boulevard.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 11 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Architectural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project. Filing B00596772-I1.

    01
  2. Alteration approved

    Filing B00596772-I1 reached an approved status.

    02
  3. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Structural Work filed to provide steel reinforcing for new louver opening on non-load bearing masonry wall or foundation wall. Provide interior concrete pad for MEP equipment. Provide outdoor flue and cladding frame support. Filing B00596772-S3.

    03
  4. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00596772-S1.

    04
  5. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Civil work being filed for repair to existing Mechanical room correspondent to the Sumner BL Houses Project. Filing B00596772-S4.

    05
  6. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing DHWH. Install of temp. condensate pump, fresh air intake and exhaust flue. Filing B00596772-S2.

    06
  7. Alteration approved

    Filing B00596772-S4 reached an approved status.

    07
  8. Alteration approved

    Filing B00596772-S3 reached an approved status.

    08
  9. Alteration approved

    Filing B00596772-S1 reached an approved status.

    09
  10. Alteration approved

    Filing B00596772-S2 reached an approved status.

    010
  11. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Civil work being filed for repair to existing Mechanical room correspondent to the Sumner BL Houses Project. Filing B00596772-P4.

    011
  12. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Architectural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project. Filing B00596772-P5.

    012
  13. Alteration approved

    Filing B00596772-P5 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for B00596772-P5 is “Approved.”

    014
  15. Alteration approved

    Filing B00596772-P4 reached an approved status.

    015
  16. Alteration now approved

    The latest status recorded for B00596772-P4 is “Approved.”

    016
  17. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00596772-P6.

    017
  18. Alteration approved

    Filing B00596772-P6 reached an approved status.

    018
  19. Alteration now approved

    The latest status recorded for B00596772-P6 is “Approved.”

    019
  20. Permit recorded for alteration

    DOB lists a first permit date for B00596772-S3. That is not by itself confirmation of activity on site.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for B00596772-S2. That is not by itself confirmation of activity on site.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for B00596772-S4. That is not by itself confirmation of activity on site.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for B00596772-I1. That is not by itself confirmation of activity on site.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for B00596772-S1. That is not by itself confirmation of activity on site.

    024
  25. Alteration now approved

    The latest status recorded for B00596772-I1 is “Permit Entire.”

    025
  26. Alteration now approved

    The latest status recorded for B00596772-S4 is “Permit Entire.”

    026
  27. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fired condensing instantaneous domestic hot water heaters. Filing B00596772-P7.

    027
  28. Alteration now approved

    The latest status recorded for B00596772-S1 is “Permit Entire.”

    028
  29. Alteration approved

    Filing B00596772-P7 reached an approved status.

    029
  30. Alteration now approved

    The latest status recorded for B00596772-P7 is “Approved.”

    030
  31. Alteration now approved

    The latest status recorded for B00596772-S3 is “Permit Entire.”

    031
  32. Alteration now approved

    The latest status recorded for B00596772-S2 is “Permit Entire.”

    032
  33. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Structural Work filed to provide steel reinforcing for new louver opening on non-load bearing masonry wall or foundation wall. Provide interior concrete pad for MEP equipment. Provide outdoor flue and cladding frame support. Filing B00596772-P9.

    033
  34. Alteration now under review

    The latest status recorded for B00596772-P9 is “Pending Plan Examiner Assignment.”

    034
  35. Alteration filed

    NYCHA Sumner BOILER-BLDG #12- Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing DHWH. Install of temp. condensate pump, fresh air intake and exhaust flue. Filing B00596772-P8.

    035
  36. Alteration now under review

    The latest status recorded for B00596772-P8 is “Pending Plan Examiner Assignment.”

    036