Building record · BIN 3346554

8 Howard Avenue

8 Howard Avenue, Brooklyn, NY 11221

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3346554

8 Howard Avenue

Bedford-Stuyvesant (East), Brooklyn

A consolidated public-record view · updated Oct 2, 2026

DOB filings
6
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records6
First included filingAug 9, 2018
Latest recorded changeOct 2, 2026

The lot

What is already here?

The lot holds a 4-story place of worship built in 1931, on a 8,650 sq ft lot.

  1. Floors 2–4Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 6 — the tallest thing within 60 m to the south is 16.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 13.5 m over 4 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1931
Floors
4
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
C4-4L
Lot area
8,650 sq ft
Building area
17,840 sq ft

The apartments

28 condominium apartments are assessed on this block, and the typical one is 666 sq ft (62 m²). They run from 56 to 124 m².

The city values the typical one at $196,396. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

Owner of record

814 SWINTON LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 12 notices on file; the most recent was issued Aug 16, 1993.

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3346554. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 6 alteration filing. Its latest status categories are 2 under review, 4 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 9, 2018
Latest recorded change
Oct 2, 2026
Highest proposed story count
4 stories
Highest proposed unit count
9 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 8 Howard Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Install construction fence filing in conjunction with application# 321813490. No change in use, egress or occupancy. Filing B00068924-I1.

    01
  2. Alteration approved

    Filing B00068924-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for B00068924-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration now approved

    The latest status recorded for B00068924-I1 is “Permit Entire.”

    04
  5. Alteration filed

    Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application. Filing B01449360-I1.

    05
  6. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B01449359-I1.

    06
  7. Alteration approved

    Filing B01449359-I1 reached an approved status.

    07
  8. Alteration filed

    Filing to protect neighbor during minor facade repair work. this system is a site specific engineered enclosure system subject to the requirements of bc 3309.17. no change in use, egress, or occupancy. Filing B01458004-I1.

    08
  9. Alteration now under review

    The latest status recorded for B01458004-I1 is “Plan Examiner Review.”

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for B01449359-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300psf. Filing B01449359-P1.

    011
  12. Alteration approved

    Filing B01449360-I1 reached an approved status.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for B01449360-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration now approved

    The latest status recorded for B01449360-I1 is “Permit Entire.”

    014
  15. Alteration filed

    Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the NYC building code. no change in use, occupancy, or egress under this application. Filing B01449360-P1.

    015
  16. Alteration approved

    Filing B01449359-P1 reached an approved status.

    016
  17. Alteration now approved

    The latest status recorded for B01449359-P1 is “Approved.”

    017
  18. Alteration now approved

    The latest status recorded for B01449359-I1 is “Permit Entire.”

    018
  19. Alteration now under review

    The latest status recorded for B01449360-P1 is “Plan Examiner Review.”

    019