DOB filing B01374259-I1
Alteration filing at 425 Cumberland Street
Building record · BIN 3347549
425 Cumberland Street, Brooklyn, NY 11238
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 3347549
425 Cumberland Street
Fort Greene, Brooklyn
A consolidated public-record view · updated Sep 10, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 7-story health facility built in 1999, on a 18,540 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 41 notices on file; the most recent was issued Aug 30, 2021.
Issued Aug 30, 2021
Issued Aug 30, 2021
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3347549. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 2 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 425 Cumberland Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Application filed for roof sheathing replacement main & bulkhead roof, as per drawings filed herewith. no change to use, egress, or occupancy. Filing B00489064-I1.
Filing B00489064-I1 reached an approved status.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. Filing B00506555-I1.
DOB lists a first permit date for B00506555-I1. That is not by itself confirmation of activity on site.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. Filing B00506555-P1.
Filing B00506555-P1 reached an approved status.
The latest status recorded for B00506555-P1 is “Approved.”
DOB lists a first permit date for B00489064-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for B00506555-I1.
The latest status recorded for B00506555-I1 is “LOC Issued.”
DOB recorded a sign-off for B00489064-I1.
The latest status recorded for B00489064-I1 is “LOC Issued.”
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of NYC code 2022. no change in use, occupancy or egress under this application. Filing B01374259-I1.
DOB lists a first permit date for B01374259-I1. That is not by itself confirmation of activity on site.
The latest status recorded for B01374259-I1 is “Permit Entire.”