Building record · BIN 3347834

25 Lawton Street

25 Lawton Street, Brooklyn, NY 11221

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 7 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3347834

25 Lawton Street

Bushwick (West), Brooklyn

A consolidated public-record view · updated Sep 23, 2026

DOB filings
8
Active-status
7
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records7
First included filingMay 27, 2021
Latest recorded changeSep 23, 2026

The lot

What is already here?

The lot holds a 3-story care home built in 1994, on a 11,600 sq ft lot.

  1. Floors 2–3Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 7 — the tallest thing within 60 m to the south is 19.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 9 m over 3 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1994
Floors
3
Residential units
0
Building type
Care home
Land use
Public facilities and institutions
Zoning district
R6
Lot area
11,600 sq ft
Building area
20,625 sq ft

Housing violations

13 violations are open against this address under the Housing Maintenance Code. 6 of them are the class the city calls immediately hazardous.

  • 6Immediately hazardous
  • 6Hazardous
  • 1Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

The apartments

16 condominium apartments are assessed on this block, and the typical one is 647 sq ft (60 m²). They run from 60 to 101 m².

The city values the typical one at $180,945. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

Owner of record

GERALD H. LIN REVOCABLE TRUST

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 30 notices on file; the most recent was issued Nov 9, 2020.

  • Elevator

    Issued Nov 9, 2020

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3347834. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 8 alteration filing. Its latest status categories are 1 recorded as completed, 7 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 27, 2021
Latest recorded change
Sep 23, 2026
Highest proposed story count
3 stories
Highest proposed unit count
40 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 25 Lawton Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Install new AC equipment in public areas on first floor & with some additional ductwork; install new kitchen & bathroom fans to replace existing; new dryer exhaust, all in existing Community Residence for the Developmentally Disabled. Filing B00420420-I1.

    01
  2. Alteration approved

    Filing B00420420-I1 reached an approved status.

    02
  3. Alteration filed

    Plumbing work as per plans filed herewith, all in conjunction with ALT II 340694671. Filing B00418850-I1.

    03
  4. Alteration approved

    Filing B00418850-I1 reached an approved status.

    04
  5. Alteration filed

    Remove 2 AO Smith boilers (HW-520) & 1 Hydrotherm boiler (MR-900B).Replace with 1 Laars Neo Therm NTH 399 Boiler in existing boiler room, per plans filed herewith. This is filed in conjunction with ALT II 34069467 & B00955986 (filed for 2nd Laars Boiler. Filing B00421139-I1.

    05
  6. Alteration approved

    Filing B00421139-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00418850-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00421139-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Plumbing work as per plans filed herewith, all in conjunction with ALT II 340694671. Filing B00418850-P1.

    09
  10. Alteration approved

    Filing B00418850-P1 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for B00418850-P1 is “Approved.”

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for B00420420-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Remove 2 AO Smith boilers (HW-520) & 1 Hydrotherm boiler (MR-900B). Replace with 2 Laars Neo Therm NTH 399 Boilers in existing boiler room, all as per plans filed herewith. This is filed in conjunction with ALT II 340694671. Filing B00421139-P1.

    013
  14. Alteration approved

    Filing B00421139-P1 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for B00421139-P1 is “Approved.”

    015
  16. Alteration filed

    Remove 2 AO Smith boilers (HW-520) & 1 Hydrotherm boiler (MR-900B).Replace with 1 Laars Neo Therm NTH 399 Boiler in existing boiler room, per plans filed herewith. This is filed in conjunction with ALT II 34069467 & B00955986 (filed for 2nd Laars Boiler. Filing B00421139-P2.

    016
  17. Alteration approved

    Filing B00421139-P2 reached an approved status.

    017
  18. Alteration now approved

    The latest status recorded for B00421139-P2 is “Approved.”

    018
  19. Alteration now approved

    The latest status recorded for B00421139-I1 is “Permit Entire.”

    019
  20. Alteration filed

    Plumbing work as per plans filed herewith, all in conjunction with ALT II 340694671. Filing B00418850-P2.

    020
  21. Alteration now approved

    The latest status recorded for B00418850-I1 is “Permit Entire.”

    021
  22. Alteration approved

    Filing B00418850-P2 reached an approved status.

    022
  23. Alteration now approved

    The latest status recorded for B00418850-P2 is “Approved.”

    023
  24. Alteration filed

    Install new AC equipment in public areas on first floor & with some additional ductwork; install new kitchen & bathroom fans to replace existing; new dryer exhaust, all in existing Community Residence for the Developmentally Disabled. Filing B00420420-P1.

    024
  25. Alteration approved

    Filing B00420420-P1 reached an approved status.

    025
  26. Alteration now approved

    The latest status recorded for B00420420-P1 is “Approved.”

    026
  27. Alteration signed off

    DOB recorded a sign-off for B00420420-I1.

    027
  28. Alteration now completed

    The latest status recorded for B00420420-I1 is “LOC Issued.”

    028