Building record · BIN 3378204

525 Clinton Street

525 Clinton Street, Brooklyn, NY 11231

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3378204

525 Clinton Street

Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn

A consolidated public-record view · updated Sep 24, 2024

DOB filings
4
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records1
First included filingMar 22, 2021
Latest recorded changeSep 24, 2024

The lot

What is already here?

The lot holds a 3-story walk-up apartment building built in 1899, with 3 homes, on a 1,400 sq ft lot.

Built
1899
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
1,400 sq ft
Building area
2,400 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3378204. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 22, 2021
Latest recorded change
Sep 24, 2024
Highest proposed story count
3 stories
Highest proposed unit count
3 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 525 Clinton Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Proposed Plumbing works on cellar level to modify existing plumbing and gas fixtures as per plan. No change in use, egress and occupancy. Filing B00485373-I1.

    01
  2. Alteration filed

    Proposed general construction works at cellar with new concrete slab, minor partition, and interior finished works as per plan. Plumbing works will be filed under separated application. No change in use, egress and occupancy. Filing B00477136-I1.

    02
  3. Alteration approved

    Filing B00485373-I1 reached an approved status.

    03
  4. Alteration approved

    Filing B00477136-I1 reached an approved status.

    04
  5. Alteration filed

    PROPOSE PLUMBING WORK AT 3RD FLOOR APPARTMENT TO ADDRESS VIOLATION#34953313P WORK INCLUDES RELOCATE TOILET, REMOVE BATHTUB, AND ADDING A SHOWER AS PER PLAN. NO ChANGE IN USE, EGRESS, OCCUPANCY. Filing B00482350-I1.

    05
  6. Alteration approved

    Filing B00482350-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for B00477136-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00482350-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for B00485373-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Proposed Plumbing works on cellar level to modify existing plumbing and gas fixtures as per plan. No change in use, egress and occupancy. Filing B00485373-P1.

    010
  11. Alteration approved

    Filing B00485373-P1 reached an approved status.

    011
  12. Alteration now approved

    The latest status recorded for B00485373-P1 is “Approved.”

    012
  13. Alteration signed off

    DOB recorded a sign-off for B00477136-I1.

    013
  14. Alteration now completed

    The latest status recorded for B00477136-I1 is “LOC Issued.”

    014
  15. Alteration signed off

    DOB recorded a sign-off for B00482350-I1.

    015
  16. Alteration now completed

    The latest status recorded for B00482350-I1 is “LOC Issued.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for B00485373-I1.

    017
  18. Alteration now completed

    The latest status recorded for B00485373-I1 is “LOC Issued.”

    018